%0 Conference Paper %A Catalan, A. %A Sinaga, F. %A Qudraturrahman, I. %D 2010 %T The role of geotechnical engineering during the prefeasibility studies and early works of Cadia East panel caving project, New South Wales, Australia %P 389-406 %E Y. Potvin %C Perth %8 20-22 April %B Caving 2010: Proceedings of the Second International Symposium on Block and Sublevel Caving %X Cadia East underground project will be one of the largest and deepest panel caves in Australia. The first extraction level will be situated about 1,200 m below surface and a second lift located about 1,400 m which shall be brought into operation simultaneously with the first lift. It has dimensions over 250 m wide with a strike length in excess of 1,200 m and a vertical extent of 800 m this could classify this ore body as a world-class mining project. The underground operation will be implemented at depth, in a hard and massive rock mass, in high stress environments which will produce important zones of induced stresses due to the mining operation and also geotechnical challenges such as cave propagation, fragmentation, stability issues and cave management will be presented. To make this project economically viable requires application of a large scale and low cost underground mass mining method in order to achieve the required high production rates. The prefeasibility study (PFS) has identified the viability of panel caving. Several geotechnical studies that include geotechnical characterisation, cavability and fragmentation assessment have been conducted. Subsidence analyses which have allowed definition of subsidence limits have been developed. Additionally, mine scale 3D stress models and stability assessments have been developed to understand the induced stress condition below 1,200 m depth. These previous studies have allowed the definition of geotechnical underground design guidelines which include the more relevant geotechnical parameters for mine design and planning at prefeasibility stage. Additionally, necessary early works have been started which include parts of the main infrastructure such as ventilation raise bores, some excavations of the material handling system, main exploration decline, portals and tunnels in poor geotechnical conditions. In the last case, it has been necessary to consider ground support and reinforcement of tunnels in weak rock mass. This paper describes the early works that have been carried out, some necessary geotechnical studies and geotechnical mine design guidelines for Cadia East project during the prefeasibility stage. %1 Perth %I Australian Centre for Geomechanics %U https://papers.acg.uwa.edu.au/p/1002_27_Catalan2/ %R 10.36487/ACG_rep/1002_27_Catalan2