TY - CPAPER T1 - A strategic approach to the design and implementation of an effective mine dewatering system T2 - Slope 2013: 2013 International Symposium on Slope Stability in Open Pit Mining and Civil Engineering AU - Bester, M AU - Nel, E AU - McGavigan, GM ED - Dight, PM A2 - Dight, PM DA - 2013/09/25 PY - 2013 PB - Australian Centre for Geomechanics PP - Perth CY - Perth C1 - Perth SP - 365 EP - 380 UR - https://papers.acg.uwa.edu.au/p/1308_22_Bester/ ER - DO - 10.36487/ACG_rep/1308_22_Bester