TY - CPAPER T1 - Waste dump steep slope construction learnings T2 - Mine Closure 2016: 11th International Conference on Mine Closure AU - Moore, WT AU - Garneau, P ED - Fourie, AB A2 - Fourie, AB ED - Tibbett, M A2 - Tibbett, M DA - 2016/03/15 PY - 2016 PB - Australian Centre for Geomechanics PP - Perth CY - Perth C1 - Perth SP - 75 EP - 88 AB - Optimising and testing final waste dump batter slope parameters prior to reclamation is a valuable step within the mine closure planning process. The aim of the testing is to increase knowledge of site specific characteristics, verify performance against the closure criteria, and assist in revising what are often high level closure costs. Newmont Boddington Gold (Boddington) is owned and operated by Newmont Asia Pacific and is located approximately 130 km southeast of Perth in Western Australia. The operations consist of two large hard rock open pits, with a current mine life until 2029, with processing of stockpiled material until 2032. The expected final footprint of the waste rock dumps is 811 hectares. In late 2014, Boddington constructed a rehabilitation trial on an outer slope of Waste Rock Dump 7 (WRD07). The primary goals of the trial were to: i) construct and verify if a steeper than currently approved slope can remain safe and stable whilst meeting closure criteria, and ii) understand the water balance of the slope. Key variables tested within the trial include a 22 degree batter angle, and three surface treatments each with varying ratios of rock armouring within the two metre oxide cover. The same prescribed gravel and topsoil materials were applied to the three surface treatments. If the trial can demonstrate that a safe and stable slope can be constructed, expected benefits to mine closure planning and execution includes a reduction in dozer pushing costs, better designed surface water drainage system, and more accurate prediction of the volume of leachate that will be required to be managed. Assessment of the slope’s performance is monitored through water balance measurements, erosion assessment and vegetation growth assessment. Monitoring equipment installed within the trial includes a lysimeter, six soil sensory nests, and a runoff/interflow collection system. This paper presents a case study of the construction of the trial. The information obtained from the project will be highly valuable in assessing the current closure plans and performance against closure criteria. KW - steep slope KW - trial KW - surface treatments KW - water balance KW - construction UR - https://papers.acg.uwa.edu.au/p/1608_02_Moore/ ER - DO - 10.36487/ACG_rep/1608_02_Moore