Authors: Spreadborough, JC


DOI https://doi.org/10.36487/ACG_rep/1002_20_Spreadborough

Cite As:
Spreadborough, JC 2010, 'Lift and production limits for hoists and belt conveyors in underground mass mining operations', in Y Potvin (ed.), Caving 2010: Proceedings of the Second International Symposium on Block and Sublevel Caving, Australian Centre for Geomechanics, Perth, pp. 297-304, https://doi.org/10.36487/ACG_rep/1002_20_Spreadborough

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
Haulage systems for future underground mass mining projects are likely to be based on current hoisting and belt conveying technologies with multiple streams and multiple flights in each stream. Hoisting is a batch process. Hoisting systems can incorporate more than one flight in each stream with provisions for buffering and batching in the transfer from one flight to another. These systems are limited in the lift of each flight by the strength and weight properties of the ropes and are limited in production by practical limits on the maximum hoisting speed. Belt conveying, however, is a continuous process. Belt conveyor systems can incorporate more than one flight in each stream with no interruption to the flow in the transfer from one flight to another. These systems are limited in the lift of each flight by the strength and weight properties of the belt and are limited in production by practical limits on the belt speed. This paper presents details of current hoisting and belt conveyor systems in underground mass mining operations, and explores the limits of application of these technologies for the increasing demands of future underground mass mining projects.

References:
Brobst, T., Gaida, M. and Dahl, B. (2008) Update on the Bingham Canyon mine underground studies, in Proceedings 5th International Conference and Exhibition on Mass Mining, Luleå University of Technology, Sweden, pp. 443–452. Brown, E.T. (2003) Block caving geomechanics - the international caving study, Julius Kruttschnitt Mineral Research Centre, Brisbane. DIN22101 (2000) 2000:08Continuous conveyors – belt conveyors for "" loose bulk materials - Basis for calculation and dimensioning, DIN Deutsches Institut für Normung e. V., Berlin. Pascoe, C., Oddie, M. and Edgar, I. (2008) Panel caving at the Resolution copper project, in Proceedings 5th International Conference and Exhibition on Mass Mining, Luleå University of Technology, Sweden, pp. 35–42. Pratt, A.G.L. (2008) Mine haulage – options and the process of choice, in Proceedings Tenth Underground Operators Conference, The Australian Institute of Mining and Metallurgy, Melbourne, pp. 178–187. Pratt, A.G.L. and Ellen, P.J. (2005) Selection of an ore haulage system for Telfer Deeps, Proceedings Hoist and Haul Conference, The Australian Institute of Mining and Metallurgy, Melbourne, pp. 131–140. Spreadborough, J.C. and Pratt, A.G.L. (2008) Inclined troughed belt conveyors for underground mass mining operations, in Proceedings Tenth Underground Operators Conference, The Australian Institute of Mining and Metallurgy, Melbourne, pp. 71–78.




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au