Authors: Bartlett, PJ


DOI https://doi.org/10.36487/ACG_rep/1002_25_Bartlett

Cite As:
Bartlett, PJ 2010, 'Considerations in planning and implementing massive underground mines at depth', in Y Potvin (ed.), Caving 2010: Proceedings of the Second International Symposium on Block and Sublevel Caving, Australian Centre for Geomechanics, Perth, pp. 359-370, https://doi.org/10.36487/ACG_rep/1002_25_Bartlett

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
Planning and implementing massive underground mines such as block caves at increasing depths is a process that can extend over many years and carries a considerable level of risk. This paper examines the time that it has taken some major underground mines to plan and implement new mines at depth and the implications of this extended process. Geotechnical concerns are a major source of uncertainty as mines move to greater depths. Gathering, interpreting and using the geotechnical data to plan and implement deep mines adds considerably to the time and uncertainty of the planning process.

References:
Areneda, O. and Sougarret, A. (2008) Lessons learned in cave mining at the El Teniente mine over the period 1997–2007, in Proceedings MassMin 2008, 5th International Conference and Exhibition on Mass Mining, Luleå, Sweden, 9–11 June.
Beck Arndt (2005) GS2006DEC25, DeBeers Premier Undercut Collapse, unpublished report, Beck Arndt Engineering.
Calder, K., Townsend, P. and Russell, F. (2000) The Palabora Underground Mine Project, in Proceedings MassMin 2000, Brisbane, Australia, 29 October to 2 November.
Casten, T., Rachmad, L., Arkadius, T., Osborne, K. and Johnson, M. (2008) PT Freeport Indonesia’s Deep Ore Zone mine – expanding to 80,000 tonnes per day, in Proceedings MassMin 2008 5th International Conference and Exhibition on Mass Mining, Luleå, Sweden, 9–11 June.
Laubscher, D.H. (1995) Cave Mining – The State of the Art, Journal of the South African Institute of Mining and Metallurgy, Vol. 94, No. 10.
Stacey, T.R. and Terbrugge, P.J. (2000) Open Pit to Underground – Transition and Interaction, in Proceedings MassMin 2000, Brisbane, Australia, 29 October to 2 November.
Windsor, C.R. (2007) WA School of Mines, PD Project Report, unpublished.




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au