Authors: Grabinsky, MW


DOI https://doi.org/10.36487/ACG_rep/1063_8_Grabinsky

Cite As:
Grabinsky, MW 2010, 'In situ monitoring for ground truthing paste backfill designs', in R Jewell & AB Fourie (eds), Paste 2010: Proceedings of the Thirteenth International Seminar on Paste and Thickened Tailings, Australian Centre for Geomechanics, Perth, pp. 85-98, https://doi.org/10.36487/ACG_rep/1063_8_Grabinsky

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
Optimised geomechanical design of cemented paste backfill systems requires feedback on the actual field performance of paste fills and their barricades during filling, subsequent curing, and exposure to ongoing mining activities. A comprehensive monitoring strategy is described and its application is demonstrated for five stopes at three different mining operations. Important information is revealed about several poorly understood phenomena including stress arching within the fill mass, barricade pressure reduction with increasing setback from the stope, temperature induced stresses, and liquefaction potential of paste fill due to production blasting and rockbursts. Consideration is given to optimised monitoring procedures that other engineers could use to investigate similar phenomena at their mines.

References:
Acker, P. (2004) Swelling, shrinkage and creep: a mechanical approach to cement hydration, Materials and Structures:
Concrete Science and Engineering, 37, pp. 237–243.
Anon (1997) Rockburst Research Handbook: Canadian Rockburst Research Program 1990–1995, CAMIRO Mining
Division, Sudbury, 3 Vol.
Aref, K., Hassani, F.P. and Churcher, D. (1989) A study on liquefaction potential of paste backfill, In Proceedings 4th
International Symposium on Mining with Backfill, Montreal, pp. 405–415.
Been, K., Brown, E.T. and Hepworth, N. (2002) Liquefaction potential of paste fill at Neves Corvo Mine, Portugal,
Transactions of the Institution of Mining and Metallurgy, April 2002, pp. A47–A58.
Clough, G.W., Iwabuchi, J., Rad, N.S. and Kuppusamy, T. (1989) Influence of cementation on liquefaction of sands,
Journal of Geotechnical Engineering, Vol. 115(8), pp. 1102–1117.
Daigle, L. and Zhao, J.Q. (2004) The influence of temperature on earth pressure cell readings, Canadian Geotechnical
Journal, Vol. 41(3), pp. 551–559.
Grabinsky, M.W., Simms, P., Bawden, W.F. and le Roux, K. (2005) In situ properties of cemented paste backfill and
implications for mine design, in Proceedings of Symposium on Mines and the Environment 2005, Rouyn-
Noranda, pp. 157–167.
Grabinsky, M.W. and Simms, P. (2006) Self-desiccation of cemented paste backfill and implications for mine design, in
Proceedings Ninth International Seminar on Paste and Thickened Tailings, R. Jewell, S. Lawson, P. Newman
(eds), Australian Centre for Geomechanics, Perth, Australia, pp. 323–332.
Grabinsky, M.W., Bawden, W.F. and Thompson, B. (2008) Back-analysis of barricade performance for a paste filled
stope, in Proceedings Symposium on Mines and the Environment 2008, Rouyn-Noranda, pp. 162–174.
Grabinsky, M.W. and Thompson, B.D. (2009) Thermally induced stresses in cemented paste backfill, Geotechnical
News, Vol. 27(3), pp. 36–40.
Helinski, M., Norris, P., Fourie, A. and Fahey, M. (2008) Preliminary results from an investigation into the effect of
application of effective stress to cemented paste backfill during curing, Australian Centre for Geomechanics
Newsletter, Vol. 31, pp. 10–13.
Helinski, M., Fourie, A., Fahey, M. and Ismail, M. (2007) Assessment of the self-desiccation process in cemented mine
backfills, Canadian Geotechnical Journal, Vol. 44, pp. 1148–1156.
Henderson, A., Revell, M.B., Landriault, D. and Coxon, J. (2005) Chapter 6: Paste Fill, In Handbook on Mine Fill,
Y. Potvin, E. Thomas and A. Fourie (eds), Australian Centre for Geomechanics, Perth, Australia, 178 p.
Landriault, D. (2006) Keynote Address: They said “It will never work” – 25 years of paste backfill 1981–2006, in
Proceedings Ninth International Seminar on Paste and Thickened Tailings, R. Jewell, S. Lawson, P. Newman
(eds), Australian Centre for Geomechanics, Perth, Australia, pp. 277–292.
le Roux, K., Bawden, W.F. and Grabinsky, M.W. (2004) Liquefaction analysis of early age cemented paste backfill, in
Proceedings Eighth International Symposium on Mining with Backfill, Beijing, pp. 233–241.
Li, L. and Aubertin, M. (2009) Influence of water pressure on the stress state in stopes with cohesionless backfill,
Geotechnical and Geological Engineering, Vol. 27, pp. 1–11.
Mitchell, R.J., Olsen, R.S. and Smith, J.D. (1982) Model studies on cemented tailings used in mine backfill, Canadian
Geotechnical Journal, Vol. 19(3), pp. 289–295.
Mitchell, R.J. (1992) Centrifuge model studies of fill pressures on temporary bulkheads, Canadian Institute of Mining
Bulletin, Vol. 85(960), pp. 48–54.
Simms, P. and Grabinsky, M.W. (2009) Direct measurement of matric suction in triaxial tests on early age cemented
paste backfill, Canadian Geotechnical Journal, Vol. 46, pp. 93–101.
Yilmaz, E., Benzaazoua, M., Belem, T. and Bussière, B. (2009) Effect of curing under pressure on compressive strength
development of cemented paste backfill, Materials Engineering, Vol. 22, pp. 772–785.




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au