Authors: Harrison, R

Paper is not available for download
Contact Us

DOI https://doi.org/10.36487/ACG_rep/1104_07_Harrison

Cite As:
Harrison, R 2011, 'Tailings treatment and water option study', in R Jewell & AB Fourie (eds), Paste 2011: Proceedings of the 14th International Seminar on Paste and Thickened Tailings, Australian Centre for Geomechanics, Perth, pp. 67-79, https://doi.org/10.36487/ACG_rep/1104_07_Harrison

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
AMEC Minproc conducted a process water option study for a Western Australian magnetite project which is proposed to produce concentrate and direct ship iron ore. With numerous raw water supply and process water management options available, a high-level mass balance model was constructed to develop 105 different scenarios. Using the model, the study firstly compares five tails dewatering methods: conventional thickening, high density thickening, paste thickening, filtration and split conventional thickening/filtration. Then for each tails dewatering method seven sub-options are considered that relate to the process water addition and concentrate filtration. Further to this, three different raw water sources, each with variable chloride chemistry, are incorporated into the analysis. The main constraints to the model are concentrate chloride limit and tails dam seepage chloride limit. Capital expense (CAPEX) and operational expense (OPEX) were then evaluated for each combination to a scoping study level (±40%). The CAPEX and OPEX are used to calculate delta net present costs (relative to the base case) which were ranked to identify the most (and least) attractive options. Semi-quantitative risk ranking was also completed for the tailings options.

References:
AREVA (16/04/2010) AREVA Desalination Plant Inauguration, Swakopmund, Namibia, viewed 21 December 2010, .
BHP Billiton (2009) Olympic Dam Expansion EIS Overview, South Australia, viewed 21 December 2010, .
CITIC Pacific Mining (2010) Desalination plant a world first, Magnitude online newsletter, July 2010, Western Australia, .
Clark, I. (2007) Ravensthorpe Nickel – Building New Capacity, in Proceedings 3rd New Caledonia Nickel Conference, 25–30 March, Noumea, New Caledonia, CD-Rom only.
Fiscor, S. (21/10/2010) Design Considerations for a Tailings Disposal System, Engineering & Mining Journal Feature, viewed 21 December 2010, .
FLSmidth (1/5/2009) FLSmidth delivers breakthrough technology in thickeners to iron ore project in Western Australia, FLSmidth media release, Western Australia, viewed 21 December 2010, .
Gindalbie Metals Ltd (2008) Karara Iron Ore Project – Public Environmental Review, Karara Mining Ltd, Chapter 2: Project Description, Western Australia.
Griffin, A. (2000) Bulong Nickel Operations Post Commissioning, in Proceedings ALTA 2000 Nickel/Cobalt-6 Conference, A. Taylor (ed), 15 May, Perth, Australia.
Rockwater Pty Ltd (2008) Karara Iron Ore Project – Groundwater Impact Assessment, Twin Hills Borefield, Western Australia, July 2008, viewed 21 December 2010, %202008.pdf?id=165.
Slottee, S., Johnson, J. and Crozier, M. (2008) Paste Thickening Iron Ore Tailings Update, 2nd International Symposium on Iron Ore, 22–26 September, Sao Luis City, Brazil.
Water-technology.net (2010) Shoaiba Desalination Plant, Saudi Arabia, viewed 7 February 2011, .
Wills, B.A. (2006) Wills’ Mineral Processing Technology, Elsevier, p. 392.




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au