Authors: Simms, P; Sivathayalan, S; Daliri, F


DOI https://doi.org/10.36487/ACG_rep/1363_06_Simms

Cite As:
Simms, P, Sivathayalan, S & Daliri, F 2013, 'Desiccation in dewatering and strength development of high-density hard rock tailings', in R Jewell, AB Fourie, J Caldwell & J Pimenta (eds), Paste 2013: Proceedings of the 16th International Seminar on Paste and Thickened Tailings, Australian Centre for Geomechanics, Perth, pp. 75-86, https://doi.org/10.36487/ACG_rep/1363_06_Simms

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
The time for a freshly deposited layer of high-density tailings to reach a given water content and the contribution of desiccation to the geotechnical behaviour of the stack are complementary pieces of information. Generic modelling analyses to predict dewatering time, first presented at the 13th International Seminar on Paste and Thickened Tailings in 2010 (Paste 2010), are compared with a laboratory simulation of multilayer deposition and select field data. The multilayer experiment supports the finding of the generic modelling predictions: the rate of dewatering decreases over time, as evaporation can be supplied by water from the underlying pre-desiccated tailings. Geotechnical behaviour is discussed using results from simple shear and vane tests on samples with different degrees of desiccation and different levels of subsequent consolidation. Desiccation appears to substantially increase strength and imparts strain hardening behaviour to tailings even after they are re-saturated and consolidated. Substantial increases in strength occur well before the shrinkage limit is reached. Finally, the relevance of shear strength development to overall stack geometry and beach angle is briefly discussed.

References:
Al-Tarhouni, M., Simms, P. and Sivathayalan, S. (2011) Cyclic behaviour of reconstituted and desiccated samples of thickened gold mine tailings, Canadian Geotechnical Journal, Vol. 48, pp. 1044–1060.
Bryan, R., Simms, P. and Verburg, R. (2010) Coupling oxidation to transient drying during multilayer deposition of thickened gold tailings, Minerals Engineering, Vol. 23, pp. 1101–1112.
Cooper, R.A. and Smith, M.E. (2011) Case study — operation of three paste disposal facilities, in Proceedings 14th International Seminar on Paste and Thickened Tailings (Paste2011), R.J. Jewell and A.B. Fourie (eds), 5‒7 April 2011, Perth, Australia, Australian Centre for Geomechanics, Perth, pp. 261–270.
Daliri, F., Simms, P. and Sivathayalan, S. (2011) A comparison of different laboratory techniques to simulate stress and moisture history of hard rock mine tailings, in Proceedings of Tailings and Mine Waste 2011 Conference, 7–11 November, Vancouver, Canada, pp. 163–175.
Fisseha, B., Bryan, R. and Simms, P. (2010) Evaporation, unsaturated flow, and salt accumulation in multilayer deposits of a paste gold tailings, ASCE Journal of Geotechnical and Geoenvironmental Engineering, Vol. 136, pp. 1703–1712.
Kam, S., Girard, J., Hmidi, N., Yao, Y. and Longo, S. (2011) Thickened tailings disposal at the Musselwhite Mine, in Proceedings 14th International Seminar on Paste and Thickened Tailings (Paste2011), R.J. Jewell and A.B. Fourie (eds), 5‒7 April 2011, Perth, Australia, Australian Centre for Geomechanics, Perth, pp. 225–236.
Kim, H., Daliri, F., Simms, P. and Sivathayalan, S. (2011) The influence of desiccation and overconsolidation on monotonic and cyclic shear response of thickened gold tailings, in Proceedings of the 64th Canadian Geotechnical Conference, Toronto, Ontario, Canada, October 2011, CD-ROM.
McPhail, G. and Brent, C. (2007) Osborne high density discharge – an update from 2004, in Proceedings Tenth International Seminar on Paste and Thickened Tailings (Paste07), A.B. Fourie and R.J. Jewell (eds), 13‒15 March 2007, Perth, Australia, Australian Centre for Geomechanics, Perth, pp. 339–350.
Mizani, S., He, L. and Simms, P. (2010) “Out of Pipe” dewatering of thickened tailings during deposition, in Proceedings 13th International Seminar on Paste and Thickened Tailings (Paste2010), R.J. Jewell and A.B. Fourie (eds), 3‒6 May 2010, Toronto, Canada, Australian Centre for Geomechanics, Perth, pp. 393–402.
Simms, P. and Grabinsky, M.W. (2004) A simple method for estimating rates of drying and desaturation of paste tailings during surface deposition, in Proceedings of Tailings and Mine Waste 2004, October, Vail, U.S.A., pp. 287–292.
Simms, P., Dunmola, A., Fisseha, B. and Bryan, R. (2010) Generic modelling of desiccation for cyclic deposition of thickened tailings to maximize density and to minimize oxidation, in Proceedings 13th International Seminar on Paste and Thickened Tailings (Paste2010), R.J. Jewell and A.B. Fourie (eds), 3‒6 May 2010, Toronto, Canada, Australian Centre for Geomechanics, Perth, pp. 293–301.
Simms, P., Grabinsky, M.W. and Zhan, G. (2007) Modelling evaporation of paste tailings from the Bulyanhulu mine, Canadian Geotechnical Journal, Vol. 44, pp. 1417–1432.




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au