DOI https://doi.org/10.36487/ACG_rep/1404_26_Hasan
Cite As:
Hasan, A, Suazo, G, Doherty, JP & Fourie, AB 2014, 'In situ measurements of cemented paste backfilling in an operating stope at Lanfranchi Mine', in Y Potvin & T Grice (eds),
Mine Fill 2014: Proceedings of the Eleventh International Symposium on Mining with Backfill, Australian Centre for Geomechanics, Perth, pp. 327-336,
https://doi.org/10.36487/ACG_rep/1404_26_Hasan
Abstract:
This paper presents results from in-stope measurements of total stress and pore pressure during and after backfilling with cemented paste backfill (CPB). Measurements were taken at the Lanfranchi Nickel Mine, Western Australia, in collaboration with Panoramic Resources Ltd. The sensor installation procedure, which was developed to fit within a tight time production schedule, is described. Direct measurements of total stress, and pore pressure throughout filling and resting cycles at specific locations within the stope provide insight into the mechanical response of mine backfill during the filling and hydrating process, which is important for developing rational models to improve mine backfill management.
References:
Belem, T, Harvey, A, Simon, R & Aubertin, M 2004, ‘Measurement and prediction of internal stresses in an underground opening during its filling with cemented fill’, Proceedings of the Fifth International Symposium on Ground Support in Mining and Underground Construction, in E Villaescusa & Y Potvin (eds), Balkema, Rotterdam, pp. 619-30.
Fourie, AB, Fahey, M & Helinski, MB 2007, ‘Using effective stress theory to characterize the behaviour of backfill’, Proceedings of the 9th International Symposium on Mining with Backfill, in FP Hassani & JF Archibald (eds), Canadian Institute of Mining, Metallurgy and Petroleum, Westmount, on CD-ROM.
Grabinsky, M, Bawden, WF & Thompson, BD 2007, ’In situ monitoring of cemented paste backfill in an Alimak stope’, Proceedings of the 60th Canadian Geotechnical Conference and 8th Joint IAH-CNC and CGS Groundwater Specialty Conference, Canadian Geotechnical Society and International Association of Hydrogeologists: Canadian National Chapter, Ottawa, pp. 2237-44.
Grice, AG 2005, ‘Introduction to Hydraulic Fill’, in Handbook on Mine Fill, in Y Potvin, EG Thomas & AB Fourie (eds), Australian Centre for Geomechanics, Perth, Western Australia, pp. 67-79.
Hasan, A, Suazo, G & Fourie, A.B. 2013, ‘Full scale experiments on the effectiveness of a drainage system for cemented paste backfill’, Proceedings of the 16th International Seminar on Paste and Thickened Tailings, eds RJ Jewell, AB Fourie, J Caldwell & J Pimenta, Australian Centre for Geomechanics, Perth, pp. 379-92.
Hassani, F, Fotoohi, K, & Doucet, C 1998, ’Instrumentation and backfill performance in a narrow vein gold mine’, International Journal of Rock Mechanics and Mining Sciences, vol. 35, no. 4/5, paper no. 106.
Helinski, M, Fahey, M & Fourie, AB, 2011, ‘Behavior of Cemented Paste Backfill in Two Mine Stopes’, Journal of Geotechnical and Geoenvironmental Engineering, vol. 137, no. 2, pp. 171-182.
Henderson, A, Revell, MB, Landriault, D & Coxon, J 2005, ’Paste Fill’, in Handbook on Mine Fill, in Y Potvin, EG Thomas &
AB Fourie (eds), Australian Centre for Geomechanics, Perth, Western Australia, pp. 83-97.
Oullet, J & Hassani, FP 2005, ‘Study of cemented pastefill and rock mass interaction and behavior in backfilled stopes’, Proceedings of the 40th U.S. Symposium on Rock Mechanics (USRMS): Rock Mechanics for Energy, Mineral and Infrastructure Development in the Northern Regions, in G Chen, S Huang, W Zhou & J Tinucci (eds), American Rock Mechanics Association, Alexandria.
Panoramic Resources Ltd 2011, Lanfranchi Operations Factsheet, Panoramic Resources Ltd, Perth, viewed 15 November 2013,
.
Standards Australia 1995a, AS 1289.3.6.2 – 1995: Soil classification tests - Determination of the particle size distribution of a soil - Analysis by sieving in combination with hydrometer analysis (subsidiary method), Standards Australia, Sydney.
Standards Australia 1995b, AS 1289.3.5.1 – 1995: Soil classification tests - Determination of the soil particle density of a soil - Standard method, Standards Australia, Sydney.
Steinour, HH 1960, ‘Concrete mix water – How impure can it be?’, Portland Cement Association Journal, vol. 2, no. 3, pp. 32-50.
Sveinson, S. 1999, ’Characterisation of Tailings for Paste Backfill System Design’, master thesis, The University of British Columbia.
Thompson, B, Bawden, W & Grabinsky, M 2012, ‘In situ measurements of cemented paste backfill at the Cayeli Mine’, Canadian Geotechnical Journal, vol. 49, pp. 755-72.
Thompson, B, Grabinsky, M & Bawden, W 2009, ‘In-situ measurements of cemented paste backfill in long-hole stopes’, Proceedings of the 3rd Canada-US Rock Mechanics Symposium & 20th Canadian Rock Mechanics Symposium, in M Diederichs & G Grasselli (eds), University of Toronto Press, Toronto, on CD-ROM.
Yumlu, M 2001, ’Backfill Practices at Çayeli Mine’, Proceedings of the 17th International Mining Congress and Exhibition of Turkey, in E Ünal, B Ünver & E Tercan (eds), The Chamber of Mining Engineers of Turkey, Ankara, pp. 333-9.