DOI https://doi.org/10.36487/ACG_rep/1410_21_Hyett
Cite As:
Hyett, AJ, Charette, FC, Forbes, BJ & Engbretson, AC 2014, 'Enlightening bolts', in M Hudyma & Y Potvin (eds),
Deep Mining 2014: Proceedings of the Seventh International Conference on Deep and High Stress Mining, Australian Centre for Geomechanics, Perth, pp. 315-328,
https://doi.org/10.36487/ACG_rep/1410_21_Hyett
Abstract:
An experimental application of distributed optical sensing is presented for measuring the strain profile along fully grouted rockbolts. Standard optical fibre was encapsulated with epoxy resin into two diametrically opposed grooves machined into standard #6 rebar and 21 mm D-Bolt. To demonstrate the capabilities of the technique laboratory tests were conducted that simulate in situ bolt deformation related to bending, axial loading and shearing. For simple bending tests the measured strain profiles agreed well (+/- 5%) with theoretical predictions. Results for axial loading agree qualitatively with theoretical models, and exhibit sufficient resolution to detect the influence of the deformed rebar ribs. Shearing results show in detail, for the first time, the distinctive coupled contraction/extension pattern predicted from theoretical studies.
References:
Aydan, Ö 1989, ‘The stabilization of rock engineering structures by rockbolts’, PhD thesis, Nagoya University, Nagoya.
Farmer, IW 1975, ‘Stress distribution along a resin grouted anchor’, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, vol. 12, pp. 347-351.
Freeman, TJ 1978, ‘The behaviour of fully grouted bolts in the Kielder experimental tunnel’, Tunnels and Tunnelling, vol. 10pp. 37-40.
Hyett AJ, Forbes, BP & Spearing, AJS 2013, ‘Enlightening bolts: using distributed optical sensing to measure the strain profile along fully grouted rock bolts’, in T Barczak, D Caudill, G Lohr, SS Peng, S Tadolini, M Thompson & B Warnick (eds), Proceedings of the 32nd International Conference on Ground Control in Mining, West Virginia University, Morgantown, pp. 107-112.
Hyett, AJ, Moosavi, M & Bawden, WF 1994, ‘Load distribution along fully grouted bolts with emphasis on cable bolt reinforcement’, International Journal for Numerical and Analytical Methods in Geomechanics, vol. 20, pp. 490-517.
Jalalifar, H 2006, ‘A new approach in determining the load transfer mechanism in fully grouted bolts’, PhD thesis, University of Wollongong, Wollongong, viewed 6 August 2014,
Li, CL & Charette, F 2010, ‘Dynamic performance of the D-Bolt’, in M Van Sint Jan & Y Potvin (eds), Proceedings of the Fifth International Seminar on Deep and High Stress Mining, Australian Centre for Geomechanics, Perth, pp. 321-328.
McHugh, E & Signer, SD 1999, ‘Roof bolt response to shear stress: laboratory analysis’, Proceedings of the18th International Conference on Ground Control in Mining, Society for Mining, Metallurgy & Exploration, Littleton, pp. 232-238.
Signer, S & Jones, S 1990, ‘A case study of grouted roof bolt loading in a two-entry gate road’, in SS Peng (ed.), Proceedings of the 9th International Conference on Ground Control in Mining, College of Mineral and Energy Resources, Morgantown, pp. 35-41.
Spearing, AJS, Hyett, AJ, Kostecki, T & Gadde, M 2013, ‘New technology for measuring the in situ performance of rock bolts’, International Journal of Rock Mechanics and Mining Sciences, vol. 57, pp. 153-166.
Windsor, C 2004, ‘A review of long, high capacity reinforcing systems in rock engineering’, in E Villaescusa & Y Potvin (eds), Proceedings of the Fifth International Symposium on Ground Support in Mining and Underground Construction, Australian Centre for Geomechanics, Perth, pp. 17-41.