Authors: Matthews, D


DOI https://doi.org/10.36487/ACG_rep/1511_14_Matthews

Cite As:
Matthews, D 2015, 'Pillar design around mullock-filled stopes in the 3500 Orebody, Mount Isa Mines', in Y Potvin (ed.), Design Methods 2015: Proceedings of the International Seminar on Design Methods in Underground Mining, Australian Centre for Geomechanics, Perth, pp. 257-272, https://doi.org/10.36487/ACG_rep/1511_14_Matthews

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
A two-lift stoping strategy was determined to extract ore close to a previously extracted mullockfilled stope leaving as small a pillar as possible. On successful extraction of the stope, the strategy was adopted for the rest of the retreat using the pillar vertical height to thickness ratio to assess pillar stability when other more generic pillar stability assessment methods predicted unstable pillars. This method has also been applied to the southern 3000 Orebody to justify the extraction of ore previously thought to be sterilised.

References:
Allnutt, J 2010, Risk assessment report into the stability of the pillar between U643 and U642 during extraction of U642, internal publication, Mount Isa Mines.
Buchanan, A, Lynn, T & Chase, A 2013, U646 L2 reconciliation, internal publication, Mount Isa Mines.
Burns, T 1993, ‘A new mine project – the 3000 and 3500 Copper Orebodies at Mount Isa’, Proceedings of the International Mining Geology Conference, Australian Institute of Mining and Metallurgy, Melbourne, pp. 87-96.
Chen, J 2002, Southern 3500 Orebody Review, Mount Isa Mines Ltd.
Chitumbura, G, Matthews, D, Ozen, I & Jackson, S 2014, ‘One mile underground – mining the N3500 Orebody at Mount Isa Mines’, Proceedings of the 12th AUSIMM Underground Operators’ Conference, Australian Institute of Mining and Metallurgy, Melbourne, pp. 267-283.
Ireland, A 2010a, U643 Stope Final Design Note, internal publication, Mount Isa Mines.
Ireland, A 2010b, Risk assessment report into driving loader on U643 paste fillmass 29E, internal publication, Mount Isa Mines.
Ireland, A, Bensley, A & Matthews, D 2010, Primary development design #2230 – Rehab of T64 SDR (U643 Lift 2 Drawpoint), internal publication, Mount Isa Mines.
Lunder, P & Pakalnis, RC 1997, Determination of the strength of hard rock pillars, Bulletin of the Canadian Institute of Mining, Metallurgy and Petroleum, vol. 90, no. 1013, pp. 51-55.
Lynn, T, Bunker, K & Buchanan, A 2013, U646 L1 reconciliation, internal publication, Mount Isa Mines.
Malan, D 2010, ‘Pillar design in hard rock mines – Can we do this with confidence’, Proceedings of the Second Australasian Ground Control in Mining Conference, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 15-30.
Matthews, D 2011, U644 Rock Mechanics Stope Note, internal publication, Mount Isa Mines.
Matthews, D 2012, U646 Rock Mechanics Stope Note, internal publication, Mount Isa Mines.
Matthews, D 2015a, Lower V Block Preliminary Geotechnical review, internal publication, Mount Isa Mines.
Matthews, D 2015b, T608 Preliminary Geotechnical review, internal publication, Mount Isa Mines.
MIM 2014, Ground Control Management Plan, internal publication, Mount Isa Mines.
Ozen, I 2011, U644 Stope Final Design Note, internal publication, Mount Isa Mines.
Ozen, I, Coackley, H & Matthews, D 2012, Primary Development Design #2720 – Rehab of 6448 XC and U644 DDR, internal publication, Mount Isa Mines.
Potvin, Y, Hudyma, M & Miller, H 1989, ‘Rib pillar design in open stope mining’, Bulletin of the Canadian Institute of Mining, Metallurgy and Petroleum, vol. 82, no. 927, pp. 31-36.
Waters, S 2010, U643 Rock Mechanics Stope Note, internal publication, Mount Isa Mines.




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au