Flores-Gonzalez, G 2019, 'Major hazards associated with cave mining: are they manageable?', in J Wesseloo (ed.), MGR 2019: Proceedings of the First International Conference on Mining Geomechanical Risk, Australian Centre for Geomechanics, Perth, pp. 31-46, https://doi.org/10.36487/ACG_rep/1905_0.3_Flores-Gonzalez

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
Cave mining methods have become viable and preferred mass underground mining options where the objectives are low cost and high production rates. However, the cave mining industry has already entered into a less certain period or environment where some of the current cave mining options are already showing not to be fully suitable to achieving the envisaged low cost and high productivity objectives. This environment includes deeper and sometimes blind deposits (up to 1,400 m from surface), lower average grade deposits, harder and heterogeneous rock masses, higher stress and, in some cases, higher temperature environments. This is requiring design of greater caving block heights, demand for increased safety and productivity, and escalating mining costs (capital and operating). In addition, there is increasing shortage of technical skills, capital becoming more difficult to access, and communities desiring higher environmental standards. In this new cave mining environment, several hazards are identified that can have critical impact on safety, productivity and profitability. It is necessary, therefore, that these major hazards be acknowledged,and the likelihood of their occurrence be evaluated and minimised during the deposit investigation, mine design and planning, and operational stages of the caving process. These are not trivial issues and can have the most serious of consequences. They demand serious managerial and technical attention (Brown 2012). This paper focuses on the major hazards associated with the caving process which are rockbursts, air blast, subsidence and inrushes. These hazards are experienced during the cave establishment (development, drawbell opening, undercutting), cave propagation, cave breakthrough to surface, and steady state production stages. Measures to manage these risks aiming to reduce their consequences are also discussed.

Keywords: hydrofracturing, intensive preconditioning, post-undercutting, rockburst, air blast, inrush, subsidence, dynamic ground support

References:
Brown, ET 2003, Block Caving Geomechanics, JKMRC Monograph Series on Mining and Mineral Processing 3, Julius Kruttschnitt Mineral Research Centre, Indooroopilly.
Brown, ET 2007, Block Caving Geomechanics, 2nd edn, Julius Kruttschnitt Mineral Research Centre, Indooroopilly.
Brown, ET & Chitombo, GP 2007, Underground Mass Mining by Caving: The way of the Future, Sustainable Minerals Institute, St Lucia, and The University of Queensland, Indooroopilly.
Carlson, G & Golden, R 2008, ‘Initiation, growth, monitoring and management of the 7210 cave at Henderson Mine – A case study’, in H Schunnesson & E Nordlund (eds), Proceedings the 5th International Conference and Exhibition on Mass Mining, Luleå University of Technology, Luleå, pp. 97–106.
Catalan, A, Onederra, I & Chitombo, G 2012a, ‘A proposed methodology for evaluation of the preconditioning by blasting at the Cadia East panel cave mine’, Proceedings of the 6th International Conference and Exhibition on Mass Mining, Canadian Institute of Mining, Metallurgy and Petroleum, Westmount.
Catalan, A, Dunstan, G, Morgan, M, Green, S, Jorquera, M & Thornhill, T 2012b, ‘An intensive preconditioning methodology developed for the Cadia East panel cave project, NSW, Australia’, Proceedings of the 6th International Conference and Exhibition on Mass Mining, Canadian Institute of Mining, Metallurgy and Petroleum, Westmount.
Catalan, A, Dunstan, G, Morgan, M, Green, S, Jorquera, S, Thornhill, T, Onederra, I & Chitombo, G 2012c, ‘How can an intensive preconditioning concept be implemented at mass mining method? Application to Cadia East panel caving project’, Proceedings of the 46th US Rock Mechanics/Geomechanics Symposium American Rock Mechanics Association, Alexandria.
Catalan, A 2015, Implementation and Assessment of Intensive Preconditioning for Cave Mining Applications, PhD thesis,
The University of Queensland, Brisbane.
Constanzo, H, Lopez, S & Videla, J 2013, ‘State of the art in cave mining’, Proceedings of the Third International Seminar on Mine Planning, pp. 145–153.
Department of Industry 2017, Investigation Report – Report into the Death of Lee Peters at the Ridgeway Mine, Cadia, NSW on
6 September 2015, Department of Industry, Resources Regulator, Government of New South Wales, viewed 6 March 2019,
Díaz, G & Morales, E 2008, ‘Tunnelling and construction for 140.000 tonnes per day – El Teniente mine – Codelco Chile’, in H Schunnesson & E Nordlund (eds), Proceedings the 5th International Conference and Exhibition on Mass Mining, Luleå University of Technology, Luleå, pp. 83–96.
Espinoza, A & Landeros, P 2014, ‘Implementation of LiDAR technology to evaluate deformation field induced by panel caving exploitation, Codelco Chile El Teniente Division’, in R Castro (ed.), Proceedings of the Third International Symposium on Block and Sublevel Caving, Universidad de Chile, Santiago, pp. 394–402.
Espinoza, AE, Mora, O & Sánchez, F 2014, ‘Application of InSAR technique for monitoring and control of surface subsidence generated by underground mining’, in R Castro (ed.), Proceedings of the Third International Symposium on Block and Sublevel Caving, Universidad de Chile, Santiago, pp. 603–610.
Flores, G 2005, Rock Mass Response to the Transition from Open Pit to Underground Cave Mining, PhD thesis, The University of Queensland, Brisbane.
Flores, G, Karzulovic, A & Brown, ET 2004, ‘Current practices and trends in cave mining’, in A Karzulovic & M Alfaro (eds), Proceedings of MassMin 2004, Chilean Engineering Institute, Santiago, pp. 83–90.
Flores, G 2014, ‘Future challenges and why cave mining must change’, in R Castro (ed.), Proceedings of the Third International Symposium on Block and Sublevel Caving, Universidad de Chile, Santiago, pp. 23–52.
Fuentes, S & Adam, E 2008, ‘Chuquicamata underground mine - project status update’, in H Schunnesson & E Nordlund (eds), Proceedings the 5th International Conference and Exhibition on Mass Mining, Luleå University of Technology, Luleå,
pp. 461–470.
Hadjigeorgiou, J & Potvin, Y 2007, ‘Overview of dynamic testing of ground support’, in Y Potvin (ed.), Proceedings of the Fourth International Seminar on Deep and High Stress Mining, Australian Centre for Geomechanics, Perth, pp. 349–371.
Hubert, G, Dirdjosuwondo, S, Plalsance, R & Thomas, L 2000, ‘Tele-operation at Freeport to reduce wet muck hazards’, in G Chitombo (ed.), Proceedings of MassMin 2000, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 173–180.
Jakubec, J, Clayton, R & Guest, AR 2012, ‘Mudrush risk evaluation’, Proceedings of the 6th International Conference and Exhibition on Mass Mining, Canadian Institute of Mining, Metallurgy and Petroleum, Westmount.
Kaiser, P & Cai, M 2012, ‘Design of rock support system under rockburst condition’, Journal of Rock Mechanics and Geotechnical Engineering, vol. 4, no. 3, pp. 215–227.
Lett, J, Brunton, I, Capes, G, Jäger, A, Mobilio, B, Rachocki, J, Sharrock, G & Secheny, M 2016a, ‘Undercutting to surface breakthrough – Cadia East panel cave (stage 1)’, in C Carr & G Chitombo (eds), Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 65–81.
Lett, J, Jäger, A, Thornhill, T, Rachocki, J & Mobilio, B 2016b, ‘Geotechnical challenges in cave monitoring – a modern approach’, in C Carr & G Chitombo (eds), Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 202–216.
Long, S, Carnovale, D & Louwrens, L 2017, ‘Mt Wright – managing unique risks’, Proceedings of the 13th AusIMM Underground Operators Conference, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 295–304.
Lowther, R, Olivier, L, Lett, J & Brunton, I 2016, ‘Implementation of a surface-based hydraulic fracturing program to successfully propagate a large cave through hard competent near-surface rock masses to achieve breakthrough’, in C Carr & G Chitombo (eds), Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 83–96.
Malovichko, D, Cuello, D & Rojas, E 2018, ‘Analysis of damaging seismic event on 24 December 2011 in the Pilar Norte sector of El Teniente mine’, in Y Potvin & J Jakubec (eds), Proceedings of the Fourth International Symposium on Block and Sublevel Caving, Australian Centre for Geomechanics, Perth, pp. 637–650.
Ortlepp, WD 1997, Rock Fracture and Rockbursts: an Illustrative Study, South African Institute of Mining and Metallurgy, Johannesburg.
Pardo, C & Rojas, E 2016, ‘Selection of exploitation method based on the experience of hydraulic fracture techniques at the El Teniente mine’, in C Carr & G Chitombo (Eds), Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 97–104.
Pascoe, C, Oddie, M & Edgar, I 2008, ‘Panel caving at the Resolution copper project’, in H Schunnesson & E Nordlund (eds), Proceedings the 5th International Conference and Exhibition on Mass Mining, Luleå University of Technology, Luleå,
pp. 35–42.
Pasek, I, Firdausi, H & Chenier, T 2016, ‘Development of the ore handling system at the Grasberg block cave mine, Indonesia’, Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourn, pp. 599–607.
Philexmonitor n.d., Geology, Reserves, and Mining Method/Processing, Philexmonitor,
Pratt, A 2016, ‘Autonomous haulage systems in underground mining – what is required for success?’, in C Carr & G Chitombo (eds), Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 35–52.
Pretorius, D & Ngidi, S 2008, ‘Cave management ensuring optimal life of mine at Palabora’, in H Schunnesson & E Nordlund (eds), Proceedings the 5th International Conference and Exhibition on Mass Mining, Luleå University of Technology, Luleå,
pp. 63–71.
Revuelta, J, Reyes, F & Pozo, R 2008, ‘El Teniente new mine level project’, Proceedings of the First International Future Mining Conference and Exhibition 2008, The Australasian Institute of Mining and Metallurgy, Melbourne, pp 39–50.
Rodríguez, W, Sánchez, J, Castro, D, Troncoso, C & Arce, J 2018, ‘Aplicación de de-stress blasting en desarrollo de túneles en ambiente de esfuerzos altos’, Proceedings of UMining 2018, pp. 472–482, in Spanish.
Rojas, E & Balboa, S 2017, ‘Management of seismic hazard in high stress condition, El Teniente mine’, in JA Vallejos (ed.), Proceedings of the 9th International Symposium on Rockbursts and Seismicity in Mines, University of Chile, Santiago, pp. 264–273.
Rojas, E & Landeros, P 2017, ‘Hydraulic fracturing applied to tunnel development at El Teniente mine’, in JA Vallejos (ed.), Proceedings of the 9th International Symposium on Rockbursts and Seismicity in Mines, University of Chile, Santiago, pp. 236–242.
Sainsbury, D, Sainsbury, B, Paetzold, H, Lourens, P & Vakili, A 2016, ‘Caving-induced subsidence behaviour of Lift 1 at the Palabora block cave mine’, in C Carr & G Chitombo (eds), Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 415–426.
Samosir, E, Basuni, J, Widijanto, E & Syaifullah, T 2008, ‘The management of wet muck at PT Freeport Indonesia’s Deep Ore Zone mine’, in H Schunnesson & E Nordlund (eds), Proceedings the 5th International Conference and Exhibition on Mass Mining, Luleå University of Technology, Luleå, pp. 323–332.
Sougarret, J, Quiñones, L, Morales, R & Apablaza, R 2004, ‘New vision in caving mining in Andina Division, Codelco Chile’,
in A Karzulovic & M Alfaro (eds), Proceedings of MassMin 2004, Chilean Engineering Institute, Santiago, pp. 542–546.
Stacey, TR & Ortlepp, DW 2000, ‘Support appropriate for dynamic loading and large static loading in block cave mining openings’,
in G Chitombo (ed.), Proceedings of MassMin 2000, The Australasian Institute of Mining and Metallurgy, Melbourne,
pp. 783–790.
Steffen, S, Poulsen, J, van As, A, Talu, S, Watt, G & Ooi, J 2016, ‘Wireless system for monitoring cave-back propagation’, in C Carr & G Chitombo (eds), Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 250–256.
Tang, B 2000, Rockburst Control Using De-stress Blasting, PhD thesis, McGill University, Montreal.
van As, A & Jeffrey, RG 2000, ‘Hydraulic fracturing as a cave inducement technique at Northparkes Mines’, in G Chitombo (ed.), Proceedings of MassMin 2000, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 165–172.
van As, A, Jeffrey, R, Chacón, E & Barrera, V 2004, ‘Preconditioning by hydraulic fracturing for block caving in a moderately stressed naturally fractured orebody’, in A Karzulovic & M Alfaro (eds), Proceedings of MassMin 2004, Chilean Engineering Institute, Santiago, pp. 535–541.
Vejrazka, C 2016, ‘Northparkes mines’ current air blast risk assessment practices for block caving operations’, in C Carr & G Chitombo (Eds), Proceedings of Mass Mining 2016, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 257–263.
Whiteman, D, Talu, S, Wilson, M, Watt, G, van As, A & Kuiper, P 2016, ‘Cave tracker flow monitoring system installation at Argyle diamond mine’, in C Carr & G Chitombo (eds), Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 479–490.
Wicaksono, D, Silalahi, K, Sryanto, I & Vallejo, J 2012’, ‘Potential hazard map for the wet muck flow prevention at the Deep ore zone (DOZ) block cave mine, Papua, Indonesia’, Proceedings of MassMin 2012, Canadian Institute of Mining, Metallurgy and Petroleum, Westmount, pp. 87-95.
Widijanto, E, Sunyoto, WS, Wilson, AD, Yudanto, W & Soebari, L 2012, ‘Lessons learned in wet muck management in Ertsberg East Skarn System of PT Freeport Indonesia’, Proceedings of MassMin 2012, Canadian Institute of Mining, Metallurgy and Petroleum, Westmount.
Wilson, A, Purba, A & Sjadat, A 2016, ‘Progressing cave performance into the later stages of the Deep Ore Zone mine’, in C Carr & G Chitombo (eds), Proceedings of the Seventh International Conference and Exhibition on Mass Mining, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 285–292.




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au