Kumari, P & Cooper, M 2019, 'Spatial data-based closure costing integrated with life of mine planning: a key enabler facilitating value realisation', in AB Fourie & M Tibbett (eds), Mine Closure 2019: Proceedings of the 13th International Conference on Mine Closure, Australian Centre for Geomechanics, Perth, pp. 1593-1606, https://doi.org/10.36487/ACG_rep/1915_125_Kumari

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
Knowing with reasonable accuracy the life-of-mine (LoM) closure cost estimate at the initial stages for operating mines can significantly help with efficient operational planning and ensure a sustainable closure—a key principle of integrated mine closure planning. The conventional, quantity surveying-based closure costing methods work reasonably well for infrastructure demolition costs compared with the landform design costs. Utilising spatial data modelling tools that allow for an accurate quantification of material movement volumes is an attractive improvement on the existing methods. Spatial models can be built to calculate closure costs from first principles. This provides a clear understanding of significant cost categories and the underlying cost drivers, resulting in accurate cost estimates. In addition, these models enable users with an efficient way of comparing multiple landform designs for any given optimisation criteria (e.g. legal, regulatory, environmental and financial constraints). Coupled with the resource management and scheduling modules, the tool enables direct integration of closure planning into the LoM planning and provides detailed LoM schedules and cash flow. Easy opportunity and risk analyses of various planning options assist in designing an optimised concurrent rehabilitation cash flow over the operational LoM, ensuring that the residual liability at the end of the life is minimal when the mine profits would usually decline. This paper presents a case study of a large open pit hard rock mining operation, the Anglo American-owned Mogalakwena platinum mine in South Africa, where the closure cost estimate was significantly improved in accuracy when using a digital terrain model (DTM) in a Deswik closure costing platform (Enviro tool and modules). Built from first principles and with detailed resource allocations (incorporating equipment/labour efficiencies and schedules), the 3D costing model highlighted that reshaping of certain waste rock dump slopes into final landform would have significant material movement costs due to constrained dumping space at the mine—enabling the mine to consider a revised LoM waste placement strategy and concurrent rehabilitation plan. This paper also discusses the challenges in establishing a flexible and robust 3D costing model, and shares learnings from the Mogalakwena project.

Keywords: closure cost, integrated closure planning, life-of-mine (LoM) planning, spatial data

References:
Bocking, KA 2010, ‘Post-closure liabilities’, Australian Centre for Geomechanics Newsletter, vol. 35, pp 20–23.
Botha, PR 2013, Mine Closure Toolbox, Anglo American PLC, Johannesburg.
Caterpillar 2017, Caterpillar Performance Handbook 2017, 47th edn, Caterpillar, viewed 1 August 2019,
Grant, CD & Lacy, HWB 2016, ‘Developing Anglo American’s integrated closure planning system requires people, process and technology working together’, in AB Fourie & M Tibbett (eds), Proceedings of the 11th International Conference on Mine Closure, Australian Centre for Geomechanics, Perth, pp 581–594.
Grant, CD, Slight, M & Lacy, HWB 2018, ‘Integrated closure planning systems: a structured approach to opportunities analysis creates significant value’, in J Wiertz & D Priscu (eds), Proceedings of Planning for Closure 2018, Gecamin, Santiago.
Haymont, R 2012, Closure Cost Estimating Methodologies: A Review of Mine Closure Cost Estimating Methodologies for Different
Reporting Purposes, Trajectory, Subiaco, viewed 8 March 2019,
International Council on Mining and Metals 2008, Planning for Integrated Mine Closure Toolkit, International Council on Mining and Metals, London.
Slingerland, N & Wilson, GW 2015, ‘End land use as a guide for integrated mine planning and closure design’, Proceedings of the Tenth International Seminar on Mine Closure, InfoMine Inc., Vancouver, pp. 235–248.




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au