Authors: Ovalle, A

Open access courtesy of:

This paper is hosted with the kind permission of the Universidad de Chile, Eighth International Conference & Exhibition on Mass Mining, 2020.


DOI https://doi.org/10.36487/ACG_repo/2063_76

Cite As:
Ovalle, A 2020, 'Analysis of the discount rate for mining projects', in R Castro, F Báez & K Suzuki (eds), MassMin 2020: Proceedings of the Eighth International Conference & Exhibition on Mass Mining, University of Chile, Santiago, pp. 1048-1064, https://doi.org/10.36487/ACG_repo/2063_76

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
The discount rate is one of the key planning parameters for defining and ranking mining projects. As miners, we assume that it is determined by a higher authority and take it as given. However, from the standpoint of a mining project, it warrants analysis. This paper discusses its definition and calculation, looking at the discount rates used in different sectors of the economy, including mining. In the case of mining, 100 projects were selected from the SEDAR database and discount rates were analysed by country-location, stage of development, size, the metals and minerals involved and project life. The average discount rate of the 100 projects was 7.18%, including 35 projects that used 5%. When these projects were excluded, the average rate was 8.36%. The discount rates used by a mining corporation over the last 50 years and an example of the effect of the discount rate on reserve determination for a block caving project are also shown and lower discount rates are recommended for long-life mining projects.

References:
Damodaran, A 2020, ‘Ratings, interest coverage ratios and default spread’, Available from <>. [3 March 2020].
Gilbertson, B & Goldberg M 1981, ‘The market model and The Johannesburg Stock Exchange’, Investment Anal. J. no. 17.
Grant Thornton and Clean Energy Pipeline Initiative 2018, ‘Renewable energy discount rate survey results – 2017’.
Jordà, Ò, Knoll, K, Kuvshinov, D, Schularick, M &Taylor AM 2017, ‘The Rate of Return on Everything, 1870-2015’, NBER Working Paper Series Working Paper 24112, <>
Khati, H 2015, ‘The discount rate - a tool for managing risk in energy investments’, International Association for Energy Economics, Fourth Quarter.
Lane, KF 1988, ’The economic definition of ore, cut-off grade in theory and practice’, Mining Journal books, London.
Lane, KF 1964, ‘Choosing the optimum cut-off grade’. Colorado School of Mines Quarterly, vol 59, no. 4, pp. 811-29.
Lilford, EV 2006, ‘The corporate cost of capital’. The Journal of the South African Institute of Mining and Metallurgy, vol. 106, pp. 139-546.
Macrotrends, 10-year-treasury-bond-rate-yield-chart, Available from .
Ni, J 2017, ‘Discount rate in project analysis’, France Stratégie, Départment Développment Durable et Numérique.
Park, SJ & Matunhire, II 2011, ‘Investigation of factors influencing the determination of discount rate and the application of quantitative methods for discount rate using risk factors in the minerals industry’, The Southern African Institute of Mining and Metallurgy, 6th Southern African Base Metals Conference, 2011.
Smith, LD 2016 ‘The RADR paradox. Discount rate, risk and long-life projects’, Presentation MES CIM Vancouver.
Smith, LD 1995, ‘Discount rates and risk assessment in mineral project evaluations’, Canadian Institute of Mining and Metallurgical Bulletin, vol. 88, no. 989, April 1995, pp.34-43.
System for Electronic Document Analysis and Retrieval (SEDAR), filing system developed for the Canadian Securities Administrators. Available from <www.sedar.com>. 0ne hundred NI 43-101 Technical Reports, 2008-2020.
Taheri, M, Bahonar, S & Irannajad, M, Ataee-Pour, M 2009, ‘Risk-adjusted discount rate estimation for evaluating mining projects, Journal of the Securities Institute of Australia, January 2009.
Terrill, M & Batrouney, H 2018, ‘Unfreezing discount rates, transport infrastructure for tomorrow’, Grattan Institute Report No. 2018-03, March 2018.
Truong, G, Partington, G & Peat, M 2008, ‘Cost of capital estimation and capital budgeting practice in Australia’, Australian Journal of Management, vol. 33, no. 1, pp. 95-122, <www.agsm.edu.au/eajm/0806/pdf/>
Vera, M, Ovalle, A & Castro, R 2019, ‘A new methodology based on Hill of Value for ore reserve selection in long-term planning for Block Caving’ MMEX-D19-00105R1, Mining Metallurgy & Exploration, October 2019.
Villiger, R & Nielsen, NH 2010, ‘Discount rates in drug development’, Available from <www.avance.ch>. Survey from < financial valuation-methods-for-biotechnology.pdf.




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au