Abstract:
Brucejack mine has been operating a paste backfill system since June 2017. In this case study, the reasons for adopting a paste backfill system will be reviewed, and actual operating conditions will be compared with the earlier envisaged design conditions. Lessons learned will be shared to provide for operational insights around the backfill system and GEHO® hydraulic piston pumps that are used for pumping paste backfill.
Keywords: paste backfill, hydraulic piston pumps
References:
Jones, IWO, Huang, J, Phifer, M, Coleman, T, Ghaffari, H, Herrera, M, … & Findlater, L 2020, Technical Report on the Brucejack Gold Mine, Northwest British Columbia, NI 43-10, prepared for Pretium Resources Inc.
Tailings 2022, Backfill of Tailings to Underground Workings,
, accessed at 19/12/2022
Vlot, E & Keijers, R 2018, ‘Pulsation-free hydraulic-driven swing tube piston pump’, in RJ Jewell & AB Fourie (eds), Paste 2018: Proceedings of the 21st International Seminar on Paste and Thickened Tailings, Australian Centre for Geomechanics, Perth, pp. 195-204,