Authors: Balthazar, D; Fleming, L; Vlot, E

Open access courtesy of:

DOI https://doi.org/10.36487/ACG_repo/2355_02

Cite As:
Balthazar, D, Fleming, L & Vlot, E 2023, 'Case study: Brucejack paste backfill pumping system', in GW Wilson, NA Beier, DC Sego, AB Fourie & D Reid (eds), Paste 2023: Proceedings of the 25th International Conference on Paste, Thickened and Filtered Tailings, University of Alberta, Edmonton, and Australian Centre for Geomechanics, Perth, pp. 40-46, https://doi.org/10.36487/ACG_repo/2355_02

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
Brucejack mine has been operating a paste backfill system since June 2017. In this case study, the reasons for adopting a paste backfill system will be reviewed, and actual operating conditions will be compared with the earlier envisaged design conditions. Lessons learned will be shared to provide for operational insights around the backfill system and GEHO® hydraulic piston pumps that are used for pumping paste backfill.

Keywords: paste backfill, hydraulic piston pumps

References:
Jones, IWO, Huang, J, Phifer, M, Coleman, T, Ghaffari, H, Herrera, M, … & Findlater, L 2020, Technical Report on the Brucejack Gold Mine, Northwest British Columbia, NI 43-10, prepared for Pretium Resources Inc.
Tailings 2022, Backfill of Tailings to Underground Workings, , accessed at 19/12/2022
Vlot, E & Keijers, R 2018, ‘Pulsation-free hydraulic-driven swing tube piston pump’, in RJ Jewell & AB Fourie (eds), Paste 2018: Proceedings of the 21st International Seminar on Paste and Thickened Tailings, Australian Centre for Geomechanics, Perth, pp. 195-204,




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au