DOI https://doi.org/10.36487/ACG_repo/2555_37
Cite As:
McFarlane, AJ, Coffey, J, Mackenzie, P & Rao, K 2025, 'A geometallurgical approach to tailings management', in AB Fourie, A Copeland, V Daigle & C MacRobert (eds),
Paste 2025: Proceedings of the 27th International Conference on Paste, Thickened and Filtered Tailings, Australian Centre for Geomechanics, Perth, pp. 527-540,
https://doi.org/10.36487/ACG_repo/2555_37
Abstract:
As dewatering technology advances in efficiency to make tailings higher in solids concentration less expensive to produce, a complementary effectiveness in technology selection is required to ensure capital investment realises value during operational implementation. From conceptual studies through to feasibility, good geometallurgical practices can minimise the risk of incorrect equipment selection. A comprehensive geometallurgical program is an iterative process of testing and verification, working with geologists to identify and sample mineralogical and textural differences between ore types, followed by metallurgical testing at various scales through successive campaigns of project development. During early stages of a project, emerging understanding of geological and metallurgical variability should be used to guide sampling such that significant samples are well represented in testing and flow sheet decisions. In later stages of projects and operations, knowledge of relevant variability can be captured in block models and applied to mine plans to support optimal scheduling and advance notice of upside and downside processing risk.
Mineralogy and textural contrast are familiar in the tailings geotechnical community, but the alteration of in situ mineralogy and rock textures through mining and processing creates unique challenges for tailings geometallurgy. Just as knowledge of mineral behaviour during primary processing informs metallurgical flow sheet development and ore sampling requirements, so too, the knowledge of mineral behaviour during tailings dewatering and impoundment can guide geometallurgical sampling during project development.
The abundance of plastic (clay) minerals and non-plastic mineral content, along with textural features such as ore hardness, provide a starting point for sampling targets and are relatively easy to determine from small sample masses.
This paper aims to provide an overview of relevant literature which can assist tailings practitioners’ discussions with their geology and metallurgy counterparts in designing and implementing sampling campaigns.
Keywords: clay mineralogy, geometallurgy, iron ore, Atterberg limits, risk mitigation
References:
Box, JC, Phillips, J & Clout, JMF 2002, ‘Use of geological material types for predicting iron ore product characteristics’, Proceedings of the 1st Japan-Australia Symposium on Iron and Steelmaking, Fuwa-Ward Symposium, Kyoto University, Kyoto, pp. 6-41.
Butcher, AR, Dehaine, Q, Menzies, AH & Michaux, SP 2023, ‘Characterisation of ore properties for geometallurgy’, Elements, vol. 19, pp. 352–358.
Castillo, C, Fawell, P, Medina, D, Mola I, Irribarra, S, Nunez, S … Carreno, H 2023, ‘Towards tailings geometallurgy: predicting thickener rake torque for copper tailings dewatering’, H Quelopana (ed.), Tailings 2023: 9th International Conference on Tailings Management, Gecamin, Santiago.
Clout, JMF & Simonson, BM 2005, ‘Precambrian iron formations and iron formation-hosted iron ore deposits’, in JW Hedenquist, JF Thompson, RJ Goldfarb & JP Richards (eds.), Economic Geology: One Hundredth Anniversary Volume, Society of Economic Geologists, Littleton, pp. 643–679.
de Souza, AH, von Kruger, FL, da Silva Araujo, FG & Mendes JJ 2021, ‘Mineralogical characterisation applied to iron ore tailings from the desliming stage with emphasis on quantitative electron microscopy (QEM)’, Materials Research, vol. 24, pp. 1–8.
Fawell, P, Castillo, C & Monch, A 2023, ‘Myths on flocculation and tailings dewatering', in H Quelopana (ed.), Proceedings of Tailings 2023: 9th International Conference on Tailings Management, Gecamin, Santiago.
Fell, R, MacGregor, P, Stapledon, D & Bell, G 2014, Geotechnical Engineering of Dams, 2nd edn, CRC Press, Leiden.
Gräfe, M, McFarlane, AJ & Klauber, C 2017, ‘Clays and the minerals processing value chain (MVPC)’, in M Gräfe, C Klauber, AJ McFarlane & DJ Robinson (eds), Clays in the Minerals Processing Value Chain, Cambridge University Press, Cambridge,
pp. 1–80.
International Council on Mining and Metals 2021, Conformance Protocols. Global Industry Standard on Tailings Management, London.
International Council on Mining and Metals, United Nations Environment Programme & Principles for Responsible Investment 2020, Global Industry Standard on Tailings Management.
Krolop, P, Niiranen, K, Gilbricht, S & Seifert, T 2021, ‘Liberation characteristics of comminuted ore types of the Per Geijer iron oxide apatite deposits’, Proceedings Iron Ore 2019, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 391-405.
Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists & Minerals Council of Australia (JORC) 2012, Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, JORC, Carlton South.
Mitchell, JK & Soga, K 2005, Fundamentals of Soil Behavior, 3rd edn, John Wiley & Sons Inc., Hoboken.
Munro, MC, A Mohajerani, A 2016, ‘Moisture content limits of iron ore fines to prevent liquefaction during transport: review and experimental study’, International Journal of Mineral Processing, vol. 148, pp. 137–146.
Nguyen, T, Talukdar, S, Wlasenko, M, & McKee, J 2019, ‘Geometallurgical approach to product prediction at a Channel Iron Deposit in the Pilbara’, Proceedings Iron Ore 2019, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 393–400.
Paine, M, Boyle, C, Lewan, A, Phuak, E, Mackenzie, P & Ryan, E 2015, ‘Geometallurgy at RTIO – a new angle on an old concept’, Proceedings Iron Ore 2015, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 142–204.
Parbhaker-Fox, A & Baumgartner, R 2023, ‘Action versus reaction: how geometallurgy can improve mine waste management across the life of mine’, Elements, vol. 19, pp. 371–376.
Raven, M & Self, P 2017, ‘Identification and quantification of clays’, in M Gräfe, C Klauber, AJ McFarlane & DJ Robinson (eds), Clays in the Minerals Processing Value Chain, Cambridge University Press, Cambridge, pp. 142–204.
Strezov, V, Ziolkowski, A, Evans, TJ, & Nelson, PF 2010, ‘Assessment of evolution of Loss on Ignition matter during heating of iron ores’, Journal of Thermal Analysis and Calorimetry, vol. 100, pp. 901–907.
Zhang, C, Pan, Z, Yin, H, Ma, C, Ma, L, Li, X 2022, ‘Influence of clay mineral content on mechanical properties and microfabric of tailings’, Scientific Reports, vol. 12.