Authors: Wu, A; Kang, Z; Ruan, Z; Wang, Y; Li, C; Wang, J; Wang, S; Xiao, B

Open access courtesy of:

DOI https://doi.org/10.36487/ACG_repo/2555_43

Cite As:
Wu, A, Kang, Z, Ruan, Z, Wang, Y, Li, C, Wang, J, Wang, S & Xiao, B 2025, 'New development and frontiers of green mining with cemented paste backfill in China', in AB Fourie, A Copeland, V Daigle & C MacRobert (eds), Paste 2025: Proceedings of the 27th International Conference on Paste, Thickened and Filtered Tailings, Australian Centre for Geomechanics, Perth, pp. 607-614, https://doi.org/10.36487/ACG_repo/2555_43

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
With its advantages of being safe, environmentally friendly, economical and highly efficient, cemented paste backfill (CPB) has been an important transformative technology for green mining in metal mines in recent years in China. Therefore, this paper provides a review of the 30-year development history of CPB in China. The first CPB system in China was built in the Jinchuan No. 2 Mining Area in 1999, and the first CPB system based on a deep cone thickener was built in Huize lead–zinc mine in 2006. Since then, China’s CPB technology has entered the next new era. At the same time, this paper analysed new technologies such as paste rheology, rake blockage prevention measures, nesting repair for filling boreholes, pipeline blockage and leakage detection, intelligent control technology and national standards. The driving of CPB in the transformation of mining was emphasised through several demonstration projects. Moreover, unmanned CPB and comprehensive utilisation of total waste based on CPB were proposed as important development frontiers.

Keywords: green mining, development history, tailings CPB, unmanned CPB, development frontiers

References:
Gao, Y, Wang, Y, Na, Q, Zhang, J & Wu, A 2024, ‘Implementation of a nesting repair technology for transportation pipeline repair’, Fluid Dynamics & Materials Processing, vol. 20, no. 11, pp. 2443–2458.
Ruan, Z, Wang, Y, Wu, A, Yin, S & Jin, F 2019, ‘A theoretical model for the rake blockage mitigation in deep cone thickener: a case study of lead-zinc mine in China’, Mathematical Problems in Engineering,
Wu, A, Ruan, Z & Wang, J 2022, ‘Rheological behavior of paste in metal mines’, International Journal of Minerals Metallurgy and Materials, vol. 29, pp. 717–726.
Wu, A, Wang, Y, Ruan, ZE, Xiao, B, Wang, J & Wang, L 2024a, ‘Key theory and technology of cemented paste backfill for green mining of metal mines’, Green and Smart Mining Engineering, vol. 1, no. 1, pp. 27–39.
Wu, A, Zhang, J, Wang, Y, Zhao, X, Ruan, Z & Wang, J 2024b, ‘Cemented paste backfill: Transformative technology for green mining in metal mines’, The Chinese Journal of Nonferrous Metals, vol. 34, pp. 1652–1666.
Wu, AX, Wu, PJ, Zou, L, Ruan, ZE, Chen, ZJ, Mo, YB, … Wang, SY 2024c, ‘Co-disposal of waste rock with unclassified tailings as cemented paste backfill at Jinchuan Nickel Mine’, in AB Fourie & D Reid (eds), Paste 2024: Proceedings of the 26th International Conference on Paste, Thickened and Filtered Tailings, Australian Centre for Geomechanics, Perth, pp. 467–474,
Xiao, B, Miao, S, Xia, D, Huang, H & Zhang, J 2023, ‘Detecting the backfill pipeline blockage and leakage through an LSTM-based deep learning model’, International Journal of Minerals Metallurgy and Materials, vol. 30, pp. 1573–1583.




© Copyright 2025, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au