Ferguson, P, Jones, D, O'Toole, D, Harvey, I & Egerton, F 2026, 'The Rum Jungle Rehabilitation Project, Northern Territory, Australia: history and initial implementation', in AB Fourie, G Boggs, J Heyes & M Tibbett (eds),
Mine Closure 2026: Proceedings of the 19th International Conference on Mine Closure, Australian Centre for Geomechanics, Perth, pp. 1-12,
https://doi.org/10.36487/ACG_repo/2615_126
Abstract:
The Rum Jungle mine site is located approximately 100 km south of Darwin in Australia’s Northern Territory. The mine was operated between 1952 and 1971 to produce uranium, and later for copper and other metals. During operations, local groundwater and the water quality of the East Branch of the Finniss River were severely impacted by acid and metalliferous drainage (AMD), and no meaningful closure or rehabilitation orks were completed when mining operations ceased. In the mid-1980s, a major rehabilitation works program works was implemented, which resulted in a substantial reduction in metal loads in the river and a significant improvement in aquatic ecosystem health downstream. The improvement was not sufficient, however, to meet contemporary environment protection standards. The Australian and Northern Territory governments therefore set up a National Partnership Agreement (NPA) to develop and implement a rehabilitation plan to bring the site to current standards.
The Northern Territory Department of Mines and Energy (DME) has developed a preferred final rehabilitation strategy for the Rum Jungle site involving backfilling the Main Pit with the highest sulphide-containing materials relocated from the existing waste rock dumps (WRDs) and constructing two new above-grade waste storage facilities (WSFs) to contain residual mine waste materials. The initial phase of rehabilitation involves dewatering the Main Pit, which commenced in September 2025, and the construction of a groundwater water treatment plant (GWTP) to treat AMD-impacted groundwater and contact water during the construction phase of rehabilitation. This paper provides an update on the rehabilitation plan and supporting technical studies, including geochemical characteristics of mine waste materials to be relocated and the water management plan, and the data collected during the initial stages of implementing the preferred rehabilitation plan.
References:
Allen, CG & Verhoeven 1986, The Rum Jungle Rehabilitation Project - Final Project Report, Northern Territory Dept of Mines & Energy, Darwin.
ANZG 2018, Australian and New Zealand Guidelines for Fresh and Marine,
Davy 1975, Rum Jungle Environmental Studies, Australian Atomic Energy Commission, AAEC/E365, Lucas Heights, NSW, pp. 322.
Hartnett, J, Jones, D & Ferguson, P 2024, ‘The Rum Jungle Rehabilitation Project, Northern Territory, Australia: history and current status’, 13th ICARD Proceedings, Canadian Institute of Mining, Metallurgy and Petroleum, Halifax, pp. 25-38,
Hydrobiology 2013, Environmental Values Downstream of the Former Rum Jungle Mine site – Phase 2 Final Draft Report, report to the NT Government.
Hydrobiology 2015, Rum Jungle Impact Assessment Monitoring Program – Sampling Manual, report to the Northern Territory Government.
Hydrobiology 2016, Rum Jungle Aquatic Ecosystem Survey. Early and Late Dry Season 2015, report to the Northern Territory Government.
Hydrobiology 2019, Rum Jungle - Refinement of LDWQTVs, report to the Northern Territory Government.
Hydrobiology 2022, Compliance LDWQOs, report to the Northern Territory Government.
Jeffree, RA, Twining, JR & Thomson, J 2001, ‘Recovery of fish communities in the Finniss River, Northern Australia, following remediation of the Rum Jungle uranium/copper mine site’, Environmental Science and Technology, vol. 35, pp. 2932–2941,
.
Jones, DR 2015, Validation of Methods to Determine the Neutralant Demand of Rum Jungle Waste Rock, report DME001/14 by DR Jones Environmental Excellence.
Jones, DR, Ferguson, P & Hartnett, J 2020, ‘Characterisation of secondary minerals to minimise post rehabilitation downstream water quality issues at legacy mine sites’, in J Pope, C Wolkersdorfer, L Sartz, A Weber & K Wolkersdorfer (eds), Proceedings of the 14th IMWA Congress, International Mine Water Association, Christchurch, pp. 38–42,
imwa_2020/IMWA_2020_proceedings.pdf
Jones, DR, Ferguson, P & Smith, R 2024, ‘Water quality performance objectives and geochemical characterisation for the Rum Jungle Legacy Site, Northern Territory (NT), Australia’, in E Jennings, M Edraki & D Jones (eds), Proceedings of the 11th Australian AMD Workshop, Sustainable Minerals Institute, The University of Queensland, Brisbane, pp. 35–41,
.
Leading Practice Sustainable Development Program (LPSDP) 2016, Preventing Acid and Metalliferous Drainage, Leading Practice Sustainable Development Program for the Mining Industry, Canberra,
Mine Environment Neutral Drainage Program (MEND) 2015, In-Pit Disposal of Reactive Mine Wastes: Approaches, Update and Case Study Results (MEND Report 2.36.1b), Ottawa,
Northern Territory Government 2020, Supplementary Report Rum Jungle Rehabilitation Project – Environmental Impact Statement.