Authors: Huan, W; Zhou, H; Weiwei, W; Wei, L

Open access courtesy of:

DOI https://doi.org/10.36487/ACG_repo/2645_42

Cite As:
Huan, W, Zhou, H, Weiwei, W & Wei, L 2026, 'Challenges and operational management of block caving by JCHX in Pulang copper mine', in A van As, D Cumming-Potvin & J Wesseloo (eds), Caving 2026: Proceedings of the Sixth International Conference on Block and Sublevel Caving, Australian Centre for Geomechanics, Perth, pp. 1-10, https://doi.org/10.36487/ACG_repo/2645_42

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
The Pulang copper mine, with a designed annual production of 12.5 million tonnes, is the largest operational block caving mine in China. To address the two core challenges of mining – the stability issues of the undercut level drifts and the risk of underground mud rush disasters – the mine has developed and implemented a multilevel, intelligent integrated technical and management system. This system encompasses intelligent oredrawing management, a graded drift support system and advanced production equipment, ensuring safe and efficient mining operations. The successful operation of the Pulang copper mine marks a significant achievement for JCHX and for China in the management and operation of large-scale block caving mining under complex geological conditions. The core lesson learned lies in acknowledging and deeply understanding the specific risks, such as drift instability and mud rushes, inherent in the geology and mining method. Adopting a systems engineering approach integrates refined process control with the application of intelligent equipment, proactive disaster prevention, and digital monitoring and early alerts. This integration forms a dynamically adaptive and continuously optimised modern mine operation system.

Keywords: block caving, mud rush prevention and control, automated ore drawing, drawpoint control, bottom structure support

References:
Fan, WL 2017, ‘Study on the stability of bottom structures in natural caving mining process’, China Mining Engineering, vol. 1, pp. 1–4.
Huang, HT, Luo, GP & Wang, H 2020, ‘Research and application of mud inrush control in natural caving mining’, World Nonferrous Metals, vol. 10, no. 2.
Li, ZR, Hou, KP, Feng, XL & Liu, HW 2021, ‘Deformation control of bottom pillar roadways under complex geological conditions in natural caving mining’, China Mining, vol. 30, no. 1, pp. 182–187.
Song, WD, Wang, YH & Du, JH 2009, ‘Study on the index system of factors influencing underground mud inrush’, Metal Mines, vol. 9, no. 5.
Wang, H & Zhu, JN 2023, ‘Analysis and study on steel arch support in fractured bottom structure areas of natural caving mining’, Modern Mining, vol. 8, no. 8, pp. 58–62.




© Copyright 2026, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information