Catalan, A & Ferguson, G 2026, 'Evaluation of caving mining methods through multi-criteria decision-making: an integrated analytic hierarchy process–analytic network process methodology', in A van As, D Cumming-Potvin & J Wesseloo (eds), Caving 2026: Proceedings of the Sixth International Conference on Block and Sublevel Caving, Australian Centre for Geomechanics, Perth, pp. 1-20, https://doi.org/10.36487/ACG_repo/2645_55

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
The increasing scale, depth and complexity of modern cave mining operations have elevated the importance of transparent, auditable and defensible decision-making in cave design and planning. Traditional approaches often rely on expert judgement applied in an informal or weakly structured manner which can obscure assumptions, hide uncertainty, and make it difficult to compare fundamentally different design options or hazard mitigation strategies. In cave mining, risk is fundamentally a function of uncertainty, with lack of knowledge representing the highest level of risk severity; consequently, reliance on comparative financial criteria alone to select alternatives can be misleading where long-term assumptions such as metal prices, discount rates and cost escalation are themselves highly uncertain. This paper presents a novel integrated analytic hierarchy process–analytic network process (AHP–ANP) framework for multi-criteria decision-making in cave mining, applied to the selection of an appropriate caving variant – specifically the comparison of macroblock panel caving versus panel caving. The framework decomposes the decision into a four-level hierarchy of goals, criteria, subcriteria, and technical factors, with rubric-anchored scoring that converts expert judgement into structured, consistent, and traceable ratings. AHP is applied where criteria are hierarchical and largely independent; ANP captures the interdependencies and feedback loops that a pure hierarchy cannot model. Pairwise comparison scores were assigned by a panel of 3 specialists with a combined cave mining experience of approximately 120 years, with all consistency ratios confirmed below the accepted threshold of 0.10. The results demonstrate that macroblock panel caving is primarily profitability-led, with decision sensitivity concentrated in operational delivery and construction enablement, while panel caving is more balanced across knowledge confidence, risk exposure, and profitability. The paper shows that structured decision frameworks substantially support expert judgement and improve its clarity, consistency, and defensibility – particularly for high-impact decisions made under conditions of limited knowledge – while remaining practical for integration into real project environments.

Keywords: block and panel caving, decision-making, multi-criteria decision-making, analytic hierarchy process, analytic network process, acceptability criteria, risk, lack of knowledge, mining alternatives

References:
Bieniawski, ZT 1992, Design Methodology in Rock Engineering, 1st edn, CRC Press, Taylor & Francis Group, Boca Raton.
Brown, ET 2004, ‘Geomechanics: the critical engineering discipline for mass mining’, in A Karzulovic & M Alfaro (eds), Proceedings MassMin 2004, Chilean Engineering Institute, Santiago, pp. 2136.
Brown, ET 2007, Block Caving Geomechanics, 2nd edn, Julius Kruttschnitt Mineral Research Centre, Brisbane.
Brown, ET 2012, ‘Progress and challenges in some areas of deep mining’, in Y Potvin (ed.), Deep Mining 2012: Proceedings of the Sixth International Seminar on Deep and High Stress Mining, Australian Centre for Geomechanics, Perth, pp. 1–24, 
10.36487/ACG_rep/1201_01_brown
Drake, PR 1998, ‘Using the analytic hierarchy process in engineering education’, International Journal of Engineering Education, vol. 14, no. 3, pp. 191–196.
Ferguson, GA 2015, Evolution of a Design Methodology for Use in Cave Mines Developed in Challenging Geomechanics Environments, PhD thesis, The University of Leeds, Leeds.
Flores, G, Karzulovic, A & Brown, ET, 2004, ‘Current practices and trends in cave mining’, in A Karzulovic & M Alfaro (eds), Proceedings MassMin 2004, Chilean Engineering Institute, Santiago, pp. 83–90.
Flores, G, 2014, ‘Future challenges and why cave mining must change’, in R Castro (ed.), Proceedings of the 3rd International Symposium on Block and Sublevel Caving, University of Chile, Santiago, pp. 23–52.
Laubscher, DH 2011, ‘Chapter 13.7: Cave mining’, in P Darling (ed.), SME Mining Engineering Handbook, 3rd edn, Society for Mining, Metallurgy, and Exploration, Englewood, pp. 1385–1397.
Laubscher, D, Guest, A & Jakubec, J 2017, Guidelines on Caving Mining Methods, The Underlying Concepts, Mass Mining Technology Project (MMT II and III), The WH Bryan Mining Geology Research Centre, Sustainable Minerals Institute, University of Queensland, Brisbane.
Saaty, TL 1990, ‘How to make a decision - the analytic hierarchy process’, European Journal of Operational Research, vol. 48, pp 9–26.
Saaty, TL 2000, Fundamentals of Decision Making and Priority Theory with the Analytic Hierarchy Process, 1st edn, Analytic Hierarchy Process Series, vol. 6, RWS Publications, Pittsburgh.
Saaty, TL & Vargas, L, 2006, Decision Making with the Analytic Network Process: Economic’ Political, Social and Technological Applications with Benefits, Opportunities, Costs and Risks, Springer, New York.
Saaty, TL & Vargas, LG 2013, Decision Making with the Analytic Network Process, 2nd edn, International Series in Operations Research & Management Science, vol. 195, Springer.




© Copyright 2026, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au