Thomas, A, Joughin, W, Khalil, H, Owre, S & Yanagimura, Y 2026, 'Design, construction and initial operation of a water re-use plug at New Afton Mine', in A van As, D Cumming-Potvin & J Wesseloo (eds), Caving 2026: Proceedings of the Sixth International Conference on Block and Sublevel Caving, Australian Centre for Geomechanics, Perth, pp. 1-14, https://doi.org/10.36487/ACG_repo/2645_68

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
Mining operations often require sealing of underground openings for range of reasons. At New Afton mine, a plug was conceptualised to impound water for the purpose of underground water re-use and to route water to existing water management infrastructure. This paper describes the advancement of this concept through to design, construction and initial operation of a parallel-type concrete plug. Defining the operating environmental and loading conditions of the plug was particularly challenging due to the uncertainties in the conditions of the overlying muckpile. This was approached by establishing a range of scenarios and checking the designed plug for energy absorption capacity relative to possible resultant inrushes. Plug design was advanced using a novel approach for concrete mass pour, incorporating filler holes from an overlying drift, to fill the core between front and back mesh-reinforced fibrecrete form walls. To control the risk of thermal cracking and for sulphate resistance, a project-specific concrete mix was developed which had high flowability to ensure complete and tight filling. Post-construction testing included a full reservoir fill, during which the plug maintained its integrity but exhibited seepage above target rates. A pressure grouting program was conducted which reduced the rate significantly. This case study provides useful information for operations in a similar situation, along with key learnings and recommendations from the process.

Keywords: underground mine plug, plug design, plug construction, inrush, water-retaining structure

References:
Bieniawski, ZT 1989, Engineering Rock Mass Classifications: A Complete Manual for Engineers and Geologists in Mining, Civil, And Petroleum Engineering, John Wiley & Sons, New York.
ISRM 1981, Rock Characterisation Testing and Monitoring, ET Brown (ed.), Pergamon Press, Oxford.
Kennedy, G & Goodchild, CH 2003, Practical Yield Line Design, 1st edn, British Cement Association and Reinforced Concrete Council, Surrey.
Lang, B 1999, ‘Permanent sealing of tunnels to retain tailings or acid rock drainage’, International Mine Water Association Proceedings, pp. 647–655.Top of FormBottom of Form
UK Health and Safety Executive 2005, The Design and Construction of Water Impounding Plugs in Working Mines, viewed 1 June 2026,
Westergaard, HM 1931, ‘Water pressure on dams during earthquakes’, Transactions of the American Society of Civil Engineers, paper no. 1835.