Doucet, C, Lampron, S, Bisson, B & Harrison, R 2006, 'Extraction of Two Sill Pillars Under Paste Backfill at Louvicourt Mine, Canada', in R Jewell, S Lawson & P Newman (eds),
Paste 2006: Proceedings of the Ninth International Seminar on Paste and Thickened Tailings, Australian Centre for Geomechanics, Perth, pp. 293-302,
https://doi.org/10.36487/ACG_repo/663_25
Abstract:
Louvicourt Mine, located approximately 500 km north-west of Montreal, Quebec, Canada, is co-owned by
the operator Aur Resources inc. (30%), Teck Corporation (25%) and Novicourt (45%). The polymetallic
orebody (Cu-Zn-Au-Ag) was mined between depths of 400 and 920 m for 11 years and the mine closed in
July 2005. Extraction of the orebody started from the 655 m and 860 m levels using a primary/secondary
ascending mining sequence with paste backfill. Extraction on two levels created a 600000-t sill pillar
between the 655 and 680 levels. Extraction below the 860 level created a second sill pillar (230000 t)
between the 860 and 885 levels. These two pillars are located under paste backfill and the rockmass in those
areas is highly fractured as a result of high mining stresses. Since the backfill was poured at the beginning of
the mine’s operation, the mixes used were not optimal and the fill quality was variable. This paper describes
the steps taken to design the mining of the stopes under paste and the results obtained for both sill pillars.
References:
Andrieux, P. and O’Connor, C. (2004) 3DEC Modelling of the recovery of secondary panels in the 680 sill pillar at Louvicourt Mine,
Itasca Consulting Canada, presentations to the mine on December 13 2003, January 16 and February 16.
Harrisson, R. (2003) Développement dans/sous le remblai en pâte à la Mine Louvicourt. Recueil des conférences du 18e Colloque en
contrôle de terrain, Association minière du Québec, 18 et 19 mars.
302 Paste2006,Limerick,Ireland
ExtractionofTwoSillPillarsUnderPasteBackfillatLouvicourtMine,Canada C.Doucet,etal.