DOI https://doi.org/10.36487/ACG_repo/863_29
Cite As:
Ansah-Sam, E, Lee, C & Hewitt, S 2008, 'Design Considerations for the Big Gossan 300 Tonnes per Hour Paste Backfill Plant System', in R Jewell, AB Fourie, P Slatter & A Paterson (eds),
Paste 2008: Proceedings of the Eleventh International Seminar on Paste and Thickened Tailings, Australian Centre for Geomechanics, Perth, pp. 317-326,
https://doi.org/10.36487/ACG_repo/863_29
Abstract:
Not Available