Ansah-Sam, E; Lee, C; Hewitt, S
|
Design Considerations for the Big Gossan 300 Tonnes per Hour Paste Backfill Plant System
Paste 2008: Proceedings of the Eleventh International Seminar on Paste and Thickened Tailings, Paste 2008
|
2008 |
|
Chang, S-H; Choi, S-W; Lee, C; Kang, T-H; Kim, J; Choi, M-S
|
Performance comparison between thin spray-on liners with different compositions
UMT 2017: Proceedings of the First International Conference on Underground Mining Technology, UMT 2017
|
2017 |
|
Jorgenson, RR; Lee, C; Nelson, R
|
The Benefits of Paste for Coal Combustion Products (CCPs): A Case Study
Paste 2006: Proceedings of the Ninth International Seminar on Paste and Thickened Tailings, Paste 2006
|
2006 |
|
Lee, C
|
Design of a reliable pressure measurement method for paste backfill pipelines
Paste 2023: Proceedings of the 25th International Conference on Paste, Thickened and Filtered Tailings, Paste 2023
|
2023 |
|
Lee, C; Chatterjee, G; Gandhe, A; Rao, BV; Nirvan, A; Ravikumar, DP
|
A comparison of two paste plants in India
Paste 2015: Proceedings of the 18th International Seminar on Paste and Thickened Tailings, Paste 2015
|
2015 |
|
Lee, C; Gillot, P
|
Case study – a high strength paste aggregate backfill at Randgold’s Loulo mine in Mali
Mine Fill 2014: Proceedings of the Eleventh International Symposium on Mining with Backfill, Mine Fill 2014
|
2014 |
|
Lee, C; Gu, F
|
An examination of improvements in co-disposal of waste rock with backfill
Paste 2017: Proceedings of the 20th International Seminar on Paste and Thickened Tailings, Paste 2017
|
2017 |
|
Lee, C; Gu, F
|
Co-disposal of waste rock with backfill
UMT 2017: Proceedings of the First International Conference on Underground Mining Technology, UMT 2017
|
2017 |
|
Lee, C; Mehrotra, S
|
Design of Booster Stations for Paste Backfill and the Implementation at Hindustan Zinc’s Rampura Agucha Mine
Paste 2020: 23rd International Conference on Paste, Thickened and Filtered Tailings, Paste 2020
|
2020 |
|
Lee, C; Pieterse, E
|
Commissioning and Operation Experience with a 400 tph Paste Backfill System at Kidd Creek Mine
Paste 2005: Proceedings of the International Seminar on Paste and Thickened Tailings, Paste 2005
|
2005 |
|