Authors | Title | Year | |
---|---|---|---|
Potgieter, GS |
Work conducted in preparation for partial extraction of X41 shaft pillar at Mount Isa Mines Design Methods 2015: Proceedings of the International Seminar on Design Methods in Underground Mining, Design Methods 2015 |
2015 | |
Potgieter, GS; Grubb, AB |
Risk-based access control at Mount Isa Copper Operations MGR 2019: Proceedings of the First International Conference on Mining Geomechanical Risk, MGR 2019 |
2019 |
Reviewer for Conferences |
---|
UMT 2020: Proceedings of the Second International Conference on Underground Mining Technology, UMT2020 |