Narendranathan, S; Patel, N; Symonds, A
|
A case study of Loy Yang Mine: geotechnical considerations
when remediating heat affected coal batters
SSIM 2021: Second International Slope Stability in Mining, SSIM 2021
|
2021 |
|
Narendranathan, S; Faithful, J; Patel, N; Stipcevich, J
|
A case study – from operation to closure, transient slope supplementation measures for the northern batters of the Hazelwood Mine, using the MGRI approach
Mine Closure 2021: Proceedings of the 14th International Conference on Mine Closure, Mine Closure 2021
|
2021 |
|
Narendranathan, S; Patel, N; Mok, T; Stipcevich, J; Symonds, A
|
A case study: conceptual rehabilitation and closure planning for the Loy Yang mine using the risk-based probabilistic approach employing the Mine Geotechnical Risk Index methodology
Mine Closure 2022: Proceedings of the 15th International Conference on Mine Closure, Mine Closure 2022
|
2022 |
|
Narendranathan, S; Anders, J; Faithful, J; Patel, N
|
A case study: consolidation properties of Hazelwood Power Station ash
Mine Closure 2019: Proceedings of the 13th International Conference on Mine Closure, Mine Closure 2019
|
2019 |
|