Authors | Title | Year | |
---|---|---|---|
Brown, K; Webster, S; Bruning, T; Garcia, O; Campbell, AD |
An iterative design and schedule approach to the E22 block cave project and production planning at CMOC Northparkes Mines: a case study Caving 2022: Proceedings of the Fifth International Conference on Block and Sublevel Caving, Caving 2022 |
2022 | |
Garcia, O; Webster, S; Bruning, T; Brown, K; Schubert, C |
Northparkes E22 deposit: a strategic re-evaluation of mine design and material handling system Caving 2022: Proceedings of the Fifth International Conference on Block and Sublevel Caving, Caving 2022 |
2022 |
Reviewer for Conferences |
---|
Caving 2022: Proceedings of the Fifth International Conference on Block and Sublevel Caving, Caving 2022 |