Authors: Johnson, J; Xie, W


DOI https://doi.org/10.36487/ACG_rep/1752_43_Johnson

Cite As:
Johnson, J & Xie, W 2017, 'Paste and thickened tailings water benefits – case studies', in A Wu & R Jewell (eds), Paste 2017: Proceedings of the 20th International Seminar on Paste and Thickened Tailings, University of Science and Technology Beijing, Beijing, pp. 387-392, https://doi.org/10.36487/ACG_rep/1752_43_Johnson

Download citation as:   ris   bibtex   endnote   text   Zotero


Abstract:
In today’s world, mining is faced with many evolving requirements and challenges that come to a head in the handling of the plant tailings. Many of which are directly related to the use and conservation of water. Water availability is reducing as the world’s demand for it expands. This is particularly true in arid climates like that of Inner Mongolia China. Water supply for the Baotou Steel mine and the livelihood of the nearby communities is supported by a 130 km long pipeline (the longest in China) which draws from the Yellow River. Conservation of this precious resource was one of the main drivers for the use of P&TT technology management of the plant tailings. The water recovery at the iron mine is successfully and consistently achieving above 95%. Recovery of the water at the paste thickeners eliminates or greatly reduces the existence of any free standing water in the tailings deposition unlike within slurry ponds where free water pools on the surface and large volumes are lost to evaporation and allows fluidization during slurry pond dam failures. This paper presents some case studies of China P&TT installations in arid and wet climates.

References:
Ausenco PSI 2010, ‘Bao Tou Iron Concentrate, Water, Thickened Tailings System’, www.ausenco.com/case studies/bao-tou-bai-yun
Barnes, E.B. and Gates, P.D. 1984, ‘Final environmental impact statement red dog mine project’, BiblioGov.
Brackebusch, F. and Shillabeer, J. 1998, ‘Use of paste for tailings disposal’, Minefill, pp. 53-58.
du Toit, T. and Crozier, M. 2012, ‘Khumani iron ore mine paste disposal and water recovery system’, the Journal of the Southern African Institute of Mining and Metallurgy, vol. 112, no. 3, pp. 211-220.
Polley 2015, ‘Report on Mount Polley Tailings Storage Facility Breach’, in Independent Expert Engineering Investigation and Review Panel. Under the directive of the Province of British Columbia, pp. 95.
Robinsky, E.I. 1999, ‘Thickened tailings disposal in the mining industry (Chap 2)’. Quebecor Printpak.
Shaw, A. and MacNamara, L. 2006, ‘Design and Commissioning of the Lisheen Backfill Plant’, in R.J. Jewell, S. Lawson and P. Newman (eds), Proceedings of the Ninth International Seminar on Paste and Thickened Tailings, Australian Centre for Geomechanics, Perth, pp, 347-358




© Copyright 2024, Australian Centre for Geomechanics (ACG), The University of Western Australia. All rights reserved.
View copyright/legal information
Please direct any queries or error reports to repository-acg@uwa.edu.au