DOI https://doi.org/10.36487/ACG_repo/2615_152
Cite As:
Lucas, R 2026, 'Room for rivers in mining landscapes: implications for mine closure design', in AB Fourie, G Boggs, J Heyes & M Tibbett (eds),
Mine Closure 2026: Proceedings of the 19th International Conference on Mine Closure, Australian Centre for Geomechanics, Perth, pp. 1-13,
https://doi.org/10.36487/ACG_repo/2615_152
Abstract:
Mines interact with rivers in numerous ways. This paper is interested in their long-term physical interactions, especially as mines close. Mine closure planning requires practitioners to assess river behaviour over timescales extending well beyond conventional engineering design horizons, while landscape evolution models (LEMs) are increasingly used to evaluate long-term erosion and sediment generation from rehabilitated landforms, usually in small streams in the headwaters. Less attention is given to the capacity of larger channels and downstream floodplains to adjust to changing hydrological and sediment regimes over equivalent timescales. Consequently, closure assessments may underestimate risks associated with channel migration, avulsion, incision, aggradation and floodplain reworking where these processes interact with residual mine landforms such as final voids, waste rock dumps and tailings storage facilities.
Internationally, the Room for Rivers (RfR) and Freedom Space concepts recognise that rivers require sufficient corridor width to accommodate geomorphic adjustment while maintaining long-term resilience. Although these concepts are increasingly incorporated into river management, it is proposed here that they could be highly useful, potentially even essential, in mine closure planning.
Keywords: mine closure, Room for Rivers, Freedom Space, geomorphology, river diversion
References:
Alluvium 2014, Criteria for Functioning River Landscape Units in Mining and Post Mining Landscapes, report for Australian Coal Association Research Program, ACARP Project C20017.
Biron, PM, Buffin-Bélanger, T, Larocque, M, Choné, G, Cloutier, CA, Ouellet, MA … Eyquem, J 2014, ‘Freedom space for rivers: a sustainable management approach to enhance river resilience’, Environmental Management, vol. 54, pp. 1056–1073.
Lucas, R 2025, ‘25 years of continuing improvement in waterway diversions’, presentation to Central Queensland Mining Rehabilitation Group, Dysart.
Milly, P, Betancourt, J, Falkenmark, M, Hirsch, R, Kundzewicz, Z, Lettenmaier, D & Stouffer, R, 2008, ‘Stationarity is dead: whither water management’, Science, vol. 319, no. 5863.
Rijke, J, van Herk, S, Zevenbergen, C & Ashley, R 2012, ‘Room for the river: delivering integrated river basin management in the Netherlands’, International Journal of River Basin Management, vol. 10, no. 4, pp. 369–382.
Rijkswaterstaat n.d., Room for the River, Ministry of Infrastructure and Water Management, Government of the Netherlands.
Van Alphen, J 2016, ‘The Delta Programme and updated flood risk management policies in the Netherlands’, Journal of Flood Risk Management, vol. 9, no. 4, pp. 310–319,
Warner, JF, van Buuren, A & Edelenbos, J (eds) 2013, ‘Making space for the river: governance experiences with multifunctional river flood management in the US and Europe’, Water Intelligence Online, vol. 11.
White, K., Lucas, R., Conn, S., Duncan, L., Hardie, R. (2015). Collaborative performance trajectories for diversion approvals
relinquishment. Report for Australian Coal Association Research Program by Alluvium Consulting, ACARP Project C23030.
Zevenbergen, C, Rijke, J, van Herk, S & Bloemen, PJTM 2015, ’Room for the river: a stepping stone in adaptive delta management’, International Journal of Water Governance, vol. 3, no. 3, pp. 121–140,