Wu, AX; Miao, XX; Liu, XH; Wang, YM; Wang, CL; Zhang, JJ
|
Paste backfill system design and commissioning at Chambishi Copper Mine
Paste 2015: Proceedings of the 18th International Seminar on Paste and Thickened Tailings, Paste 2015
|
2015 |
|
Zhang, G; Yang, Z; Wang, YQ, Gao, Q
|
Application of research on a new cementing material for full-tailings backfill in the layered filling mining method at the Gaoguanying Iron Mine
Mine Fill 2014: Proceedings of the Eleventh International Symposium on Mining with Backfill, Mine Fill 2014
|
2014 |
|
Wang, YT; Yang, Z; Gao, Q; Li, M
|
Development and utilisation of Jinchuan copper slag and desulfurisation ash
Mine Fill 2014: Proceedings of the Eleventh International Symposium on Mining with Backfill, Mine Fill 2014
|
2014 |
|
Li, M; Gao, Q; Yang, Z; Wang, YT
|
Experiment and analysis of hydration mechanisms on the new backfilling cementitious materials
Mine Fill 2014: Proceedings of the Eleventh International Symposium on Mining with Backfill, Mine Fill 2014
|
2014 |
|
Yang, Z; Gao, Q; Wang, YQ; Chen, DX; Yao, WX
|
Industrial experiment study on full tailings cemented backfill for the downward slicing drift mining method in Jinchuan Nickel Mine
Mine Fill 2014: Proceedings of the Eleventh International Symposium on Mining with Backfill, Mine Fill 2014
|
2014 |
|
Wu, AX; Miao, XX; Wang, HJ; Jiao, HZ; Wang, YM
|
The application of the cemented thickened/paste tailings backfill with large flow capacity in Chinese iron mines
Mine Fill 2014: Proceedings of the Eleventh International Symposium on Mining with Backfill, Mine Fill 2014
|
2014 |
|