Click on the column headers to sort.
Show search.
Authors
|
Title
|
Year
|
|
Arndt, S; Villa, D; Khodayari, F; Ndlovu, B
|
Investigating economic and risk metrics using design of experiments in fully coupled caving geomechanics simulation
Caving 2022: Proceedings of the Fifth International Conference on Block and Sublevel Caving, Caving 2022
|
2022 |
|
Khodayari, F; Diering, T
|
Material flow simulation using marker mixing
Caving 2022: Proceedings of the Fifth International Conference on Block and Sublevel Caving, Caving 2022
|
2022 |
|
Khodayari, F; Pourrahimian, Y; Ben-Awuah, E
|
Application of mathematical modelling for draw control under material flow uncertainty
Caving 2018: Proceedings of the Fourth International Symposium on Block and Sublevel Caving, Caving 2018
|
2018 |
|
Malaki, S; Khodayari, F; Pourrahimian, Y; Liu, WV
|
An application of mathematical programming and sequential Gaussian simulation for block cave production scheduling
UMT 2017: Proceedings of the First International Conference on Underground Mining Technology, UMT 2017
|
2017 |
|
Nezhadshahmohammad, F; Khodayari, F; Pourrahimian, Y
|
Draw rate optimisation in block cave production scheduling using mathematical programming
UMT 2017: Proceedings of the First International Conference on Underground Mining Technology, UMT 2017
|
2017 |
|