Bound hard copies of the proceedings are available to purchase from the ACG shop.
Proceedings AcknowledgementsAuthors | Title | Year | |
---|---|---|---|
Winder, K; Maney, B |
The advantages of mechanised cable bolting in the modern underground mine SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Spathis, AT; Yuill, G; Stow, D |
Assessment of tunnel perimeters produced by blasting SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Schunnesson, H |
Modern tools and equipment for tunnelling and drifting SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Rispin, M; Howard, D; Kleven, OB; Garshol, K; Gelson, J |
Safer, deeper, faster: sprayed concrete — an integral component of development mining SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Potvin, Y |
Surface support in extreme ground conditions — HEA Mesh™ SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Parsons, S |
DynoMiner™ Delivery Systems and TITAN® 7000 emulsion series — the safe and productive solution to development charging SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Parrott, TT; Price, S; Keall, PC |
Development rates in poor ground conditions SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Owen, ML |
Workforce exposure to rockfalls in underground mines SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Nord, G; Bray, P |
Key factors to consider before jumping head first into rapid mine drifting — is your operation ready? SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Nilsen, F |
The Svea tunnel — record performance in arctic conditions SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Neugebauer, E |
Roofex™ — a new flexible rockbolting concept SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Loncaric, AJ; Loomes, A; Lett, J; Emmi, J |
Control and measurement of shotcrete thickness SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Loncaric, AJ; Donnelly, B |
Proposed training programme for shotcrete operators SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Lessard, JF; Heal, D |
Evolution of ground support practices within the development cycle at Perseverance Mine SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Huang, Y |
The impact of an unexpected fault zone and groundwater in a ramp development on cost and production rate — a case study SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Goncalves, CG; Naidoo, V |
Electronic detonators and the Gautrain rapid rail project SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Edhammer, M; Gustafsson, H |
Quality assurance in rockbolting using modern computerised equipment SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Dunn, PG |
Hydroscaling technology for rapid drift development SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Dight, P; Hulls, IR |
Maturity and shotcrete strength for early re-entry SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Coates, R; Brown, S; Bucher, R; Roth, A |
Fully mechanised installation of high-tensile chain-link mesh for surface support in tunnels SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Charette, F |
Considerations on the selection of rockbolts for rapid and secure mine development SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 | |
Bäckblom, G; Hedström, O |
Faster and better development in the LKAB Malmberget mine — results of a joint project from 2006–2007 SRDM 2009: Proceedings of the First International Seminar on Safe and Rapid Development Mining, SRDM 2009 |
2009 |